My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_2002 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 3:26:44 PM
Creation date
12/16/2019 1:48:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2010
RECORD_ID
PR0231223
PE
2361
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
01
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
473
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging 1 SIR Equipment: S Check this box if tank gauc used only for inventory control. <br /> ❑ Check this box if no tank ga,.,og or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Ws <br /> Has all input wiring been inspected for proper entry and termination,including testing for ground faults?Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Was accuracy of system product level readings tested?Was accuracy of system water level readings tested? <br /> ' Were all probes reinstalled properly? <br /> ' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> Section H,below,describe how and when these deficiencies were or will be corrected. <br /> e Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete rfollowin checklist:S Yes For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perform1he apply)Simulated leak rate: S 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h.S Yes Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> S Yes Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> S N/A <br /> S Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> S Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disa <br /> ❑ N/A <br /> S Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑ N/A <br /> S Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> S Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 1 Section H,below,describe how and when these deficiencies were or will be corrected. <br /> j. Comments: <br /> Monitoring System Certification <br /> Page 3 of a 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.