My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_2002 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 3:26:44 PM
Creation date
12/16/2019 1:48:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2010
RECORD_ID
PR0231223
PE
2361
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
01
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
473
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAN -N COUNTY ENVIRONMENTAL IIEALT—DEPARTMENT <br /> UNDERGROUND STORAGE TANI <br /> MONITORING PLAN —PAGE I <br /> TYPE OF ACTION I.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> PLAN TYPE J&MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moe. i <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): _ <br /> I. FACILITY INFORMATION <br /> t ��ff - l Y <br /> PAC1�!?'Y lD#(490 Use l�ttly) .' 0 enc <br /> Lmi <br /> FACILITY NAME <br /> f FACILITY SITE ADDRESS �3�- vo <br /> II. EQ IPMENT TESTING AND PREVENTIVE MAINTENANCE 6106 } <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sc rsors,probes,line leak detectors,etc.)be rsonnperform�in <br /> accordance with the equipment manufacturers'instfuctions,or annual whichever is more frequent. Such work must be perform <br /> by qualified personnel. M07 <br /> MONITORING EQUIPriIENT IS SERV ICED (?I.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the Locations where monitoring is perforin (i.e.,location of each sensor, <br /> line Leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan Map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING MIo <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> .1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) Mn <br /> SECONDARY CONTAINMENT IS: C3 a..E b.LIQUID ❑ M;UNDER PRESSURE MODEL C3 d.UNDERCVA�C)liA1 M13 <br /> PANEL MANUFACTURER: ��t� Jl� �'` '' ul4 #: '44 <br /> �7 –e <br /> LEAK SENSOR MANUFACTURER: I n MODEL#(S): _ <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR clnlrl F W LCL TAS CI (5) <br /> MI6. MIT <br /> PANEL MANUFACTURER: MODEL#: <br /> MIs. MODEL#(S): M19 <br /> IN=fANKPROBE MANUFACTURER: c.WEEKLY NCO <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY-T IGHTLY ❑ 141I <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M z M23 <br /> PROGRAMMED TESTS: ❑ it.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): ' M24 <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 N175 <br /> TESTING PERIOD: ❑ a.36 HOURS El b.60 HOURS <br /> p 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> 111Mze. Mz7. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agenc>approval) <br /> MZ8. <br /> ❑ 99.OTHER(Specify): _ <br /> V. PIPE MONITORING <br /> M NITORING 1S PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> I CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S�TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a.DRY b.LIQUID FILLED [3c.UNDER PRESSURE d.UNDER VACUUM <br /> II PANEL MANUFACTURER: Ujrjilvo I _ 'A'2- MODEL.#: 7– O M33. <br /> I LEAK SENSOR MANUFACTURER: 1,(( et M34• MODEL#(S): _x&972- M366 <br /> 3 <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? a a.YES ❑ b.NO M . <br /> { WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO W7 <br /> 1`72.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND R�RICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s); M18. MODEL#(S): M39 <br /> 9,3.ELECTRONIC LINE LEAK DETECTOR(�AT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS A � <br /> ELLD MANUFACTURER: _ kIlC%r M40 MODEL#: ��GU X141 <br /> e <br /> PROGRAMMED LINE INTEGRITY TESTS: El " <br /> a.MINIMUM MONTHLY 0.2 g.p.h. kb.MINIMUM ANNUAL 0.1 g.p.h. 4' <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN' �e.YES ❑ b.NO M43 I <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. Mas. <br /> ❑ 5.VISUAL MONITORING DONE: C1 a.DAILY ❑ b.WEEKLY" ❑ c.MIK.MONTHLY&EACH TIME SYSTEM OPERATED"' Ha7 <br /> *Requires agency approval -Allowed for monitoring of unburied emergency generator fuel piping only per HSC VS281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(x)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> Q 99.OTHER(Specify) Maa. <br /> SJCEHD-d(07/03)-1/4 07123/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.