My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2300 - Underground Storage Tank Program
>
PR0504481
>
REMOVAL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 11:23:11 AM
Creation date
12/17/2019 10:33:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2015
RECORD_ID
PR0504481
PE
2381
FACILITY_ID
FA0006215
FACILITY_NAME
VALLEY MOTORS C/O CITY OF STOCKTON
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
04
SITE_LOCATION
800 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location: 800 East Main Street, Stockton, CA 95202 <br /> Owner City of Stockton Phone No: (209)937-8374 <br /> Contractor: Advanced GeoEnvironmental, Inc. Phone No: (209)467-1006 <br /> License No: 680227 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> x 2. Submission of verification, e.g., load ticket, within 30 days of project completion that <br /> one of the following materials was placed in the excavation in 12" lifts: <br /> A. Pea gravel--smooth, rounded material not more than one-half(1/2) <br /> inch in diameter <br /> x B. Crushed rock--self-compacting material not more than three-quarters <br /> (3/4)) inch in cross sectional measurement. (Use of crushed rock will <br /> not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar <br /> materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> wiproject completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> *Name Robert E. Marty <br /> not <br /> Title President <br /> n nt <br /> Signature <br /> *Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.