Laserfiche WebLink
i <br /> r <br /> excavation may contribute to remediation of the documented contaminated ground water at this <br /> site. <br /> PHS/EHD approves the Workplan with the condition that an addendum be submitted to <br /> PHS/EHD describing control of groundwater encountered during the overexcavation of the <br /> former UST location. <br /> Please schedule an inspection with PHS/EHD 48 hours prior sampling of the excavation. <br /> For further information please contact Steven Sasson at (209) 468-3459. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Steven asson, Senior REHS . Diane IM. i on, REHS <br /> Site Mitigation Unit Supervisor <br /> SS <br /> cc: William Hunter, Wm. J. Hunter and Associates <br /> cc: CVRWQCB, Underground Storage Tank Unit i <br /> cc: SWRCB, Underground Storage Tank Program <br /> a <br /> i <br /> 5 <br /> II <br /> i <br /> i, <br /> i <br /> I <br /> ' 1 <br /> I� <br /> S <br /> 1 <br /> a <br /> I <br /> 11 <br /> . 1 <br /> a <br /> i <br /> j <br /> ; <br /> 5 <br /> r <br />