Laserfiche WebLink
File No. 8013-01 <br /> May 30, 1999 - <br /> Pa�ce 1 <br /> 1.0 SITE LOCATION AND DESCRIPTION <br /> The subject property is located at the intersection of Fremont and Stockton Streets in Stockton, <br /> California (see Figure 1). The subject property is a former display manufacturing business. The <br /> property consists of a commercial building situated on several parcels totaling approximately 114 1 <br /> acre. <br /> A single, 500-gallon underground fuel storage tank had apparently been used to store leaded <br /> gasoline for use in the company vehicles. The tank was located at the northeast rear of the <br /> building (see Figure 2). <br /> 2.0 PROJECT HISTORY <br /> In February 1988, the underground fuel storage tank was removed. Evidence of soil <br /> contamination as gasoline was noted during tank removal. Soil sample analysis confirmed the <br /> presence of total petroleum hydrocarbons as gasoline (TPHg) in the soil to a depth of at least 16 <br /> feet. The San Joaquin County Public Health District (San Joaquin County) subsequently issued <br /> a directive to assess the extent of soil and groundwater contamination. <br /> In March 1994, three groundwater monitoring wells(MW-1, MW-2 and MW-3)were installed at <br /> the site in the vicinity of the former tank (see figure 3). The wells were installed to depths of <br /> approximately 30 feet each, and screened over depths of approximately 15 to 30 feet. _. <br /> During installation of the wells, soil contamination was noted to be present in well borehole MW-2 <br /> to a depth of approximately 20 feet. This depth equated to the approximate top of the water table. <br /> Groundwater contamination was also detected in this well. No soil contamination was apparently I <br /> detected in well boreholes MW-1 and MW-3. <br /> In December 1994, overexcavation of contaminated soil in the vicinity of the former underground <br /> tank was conducted. Approximately 108 cubic yards of contaminated soil was overexcavated in <br /> the vicinity of the former tank. <br /> In November 1995 and January 1996, a total of eleven soil probe holes were advanced in the <br /> vicinity of, and down-gradient of, the former tank. Soil and groundwater samples were collected <br /> to define the lateral extent of soil and groundwater contamination. The results were presented in h <br /> the February 1996 report by Wm. J. Hunter&Associates titled.Interim Report Covering Results <br /> of Soil& Groundwater Investigation. <br /> In May 1996, a fourth groundwater monitoring well (MW-4)was installed down-gradient of.the site <br /> (see Figure 3). The well was installed to a depth of approximately 25 feet, and screened over a <br /> depth of approximately 5 to 25 feet. Quarterly_ groundwater monitoring and sampling of the four <br /> ,. wells has continued since. - <br /> t <br /> 3.0 CURRENT WORK <br /> In December 1998, JJW Geosciences prepared a workplan for placement and monitoring of <br /> Oxygen Release Compound (ORCO) in well MW-2. The workplan was approved by San Joaquin <br /> County in December 1998. This report presents the first of three reports covering the ORCO <br /> placement and monitoring. <br /> JJW GEOSClENCFS Inc. <br />