Laserfiche WebLink
Where: <br />Nr = Resultant average concentration of nitrate-nitrogen in recharge water - (ppm NO3-N) <br />I = Volume rate of wastewater entering the soil averaged over the gross developed area in inches per yr <br />Nw = Total nitrogen concentration of wastewater in mg NIL <br />d = Fraction (%) of nitrate-nitrogen denitrified. <br />R = Ave. recharge rate of rainfall - inches per yr From San Joaquin County Isohyetal map. NLS§ 3.2 <br />Nb = Background nitrate-nitrogen concentration of rainfall recharge, exclusive of wastewater influences <br />(ppm NO3-N). <br />Values and Assumptions: <br />I = 9,984 gals = total WW/vr = 1,335 cu ft = 0.00547 in/yr <br />67.19 Ac x 43,560 sq ft/Ac x (1 ft/12 in) <br />Nw = 62 mg N/L <br />d = Assume 10% due to the low percentage of clay soil at the soil-effluent interface. <br />R = 9.5 in/yr. <br />N b = Assumed to be 0.1 ppm NO3-N <br />0.00547 in/yr (62 mg N/L) (1 -0.10) + (9.5 in/yr x 0.1 mg/L) <br />Nr = (0.00547 in/yr + 9.5 in/yr) <br />Nr = 0.132 ppm as nitrate-nitrogen (NO3 -N), <br />IV. SEPTIC SYSTEM DESIGN: OPERATIONAL PARAMETERS AND COMPONENTS <br />A. SEPTIC TANK <br />Septic tanks store accumulated sludge, scum and effluent (clear zone) volumes, which in turn affect <br />treatment of nitrogen within the tanks. Detention time calculations demonstrate that when the <br />maximum ADF is applied to the existing tank, there remains ample detention time: <br />Detention Time Calculation: <br />Detention Time = 1,200 gal tank capacity x 0.70 (30% volume lost to sludge/scum accumulation) <br />1.5 (Peaking factor) x 32 gals/day (ADF) <br />Detention Time = 17.5 days. The minimum acceptable detention time is 1.0 day. <br />FILTER BED SIZING CALCULATIONS <br />Base Tank Capacity (BTC) = 1,200 gal. Leachline Equivalent Requirement = 1,200 gallons BTC + 32 gpd <br />ADF x 0.200 sandy loam Soil Factor (SF) = 246 lineal feet of leachline (LFLL). <br />246 LFLL x 3 (Filter Bed Soil Factor) = 740 sq ft. Filter bed is to be rectangular: 37 ft E-W, 20 ft N-S. <br />Page -6- <br />Chesney Consulting