Laserfiche WebLink
11. Please include a copy of any studies ( soils, geology, marketing, <br /> etc. ) that ybu 'may have had prepared for this project or project <br /> C . PROJECT CHARACTERISTICS <br /> 1 . Services : Indicate how the following services will be provide&. <br /> for your project and availability of service . <br /> a . Water Supply: ;?• ✓mac/i <br /> b. Sewage Disposal: <br /> C. Storm Drainage: Si sn r <br /> If an extension of any of the above is necessary, indicate <br /> which service ( s ) , what agency will be providing the <br /> service ( s ) , and the distance of the extension ( s ) : <br /> d. Natural Gas : . 6 '�E <br /> e . Electricity: C5 F <br /> f . Road/Access ( i .e . , paved, unpaved,, public/private, road name ) : <br /> Al /A Lai c - fK 6/,, - �vG,/ <br /> g . Fire: /✓loiAd.c Distance to nearest fire station: It m,Gr <br /> h . Schools: -5-- <br /> 2 . <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures , number of trees removed, etc. ) . <br /> /GG1� 2, i- . rdd • i'!w 7 e- <br /> Cines •6 u.•%,l.•r�� O.i<lr- <br /> 3. Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> le ]] <br /> Types of emissions and sources associated with project 41/ Alf <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? L.-'NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> Irrigated Not irrigated r/ <br /> Major Subdivision - 9 - (6/86 ) <br />