My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012692
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATKINSON
>
24889
>
2600 - Land Use Program
>
SD-92-39
>
SU0012692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2019 11:38:14 AM
Creation date
12/18/2019 11:35:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012692
PE
2680
FACILITY_NAME
SD-92-39
STREET_NUMBER
24889
Direction
N
STREET_NAME
WATKINSON
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
02104318
ENTERED_DATE
12/17/2019 12:00:00 AM
SITE_LOCATION
24889 N WATKINSON RD
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD REQUIREMENTS <br /> SD-92-39 <br /> PAGE TWO <br /> (h) Other Codes. The second unit dwelling shall conform with <br /> all the requirements of the Local Health District and the <br /> County that are applicable to residential units in the zone <br /> in which the property is located; <br /> (i) Requirements for Mobilehomes. If the second unit dwelling <br /> is a mobilehome, the following additional requirements shall <br /> apply: <br /> (1) Additions. No permanent room additions shall be <br /> allowed, but patio covers constructed of the same <br /> materials as the mobilehome shall be permitted; <br /> (2) Skirting. Skirting constructed of the same materials <br /> as the mobilehome shall be installed; <br /> (3) Time Limit. The Second Unit Dwelling Permit shall be <br /> effective for not more than three (3) years. <br /> Applications for renewal shall follow the same <br /> procedures, be subject to the same requirements, and <br /> pay the same fees as a new application for a Second <br /> Unit Dwelling Permit; <br /> (4) Construction Standards. The mobilehome shall be <br /> constructed to meet the minimum standards of the <br /> National Manufactured Housing Construction and Safety <br /> Act of 1974 . <br /> BUILDING INSPECTION DIVISION: <br /> 1. Obtain a mobilehome installation permit. <br /> PUBLIC HEALTH SERVICES: <br /> 1. Construct an individual sewage disposal system(s) under <br /> a permit and inspection by the Environmental Hea.1th <br /> Division at the time of development. <br /> PLANNING: <br /> NOTE: An additional address will be assigned for your second <br /> unit dwelling. Your additional address is 24877 North <br /> Watkinson Road, Acampo. <br /> ----------------------------------------------------------------- <br /> NOTE: The permit will expire on October 17, 1994 . Renewal <br /> will require a new application with a new fee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.