Laserfiche WebLink
11. Please include a copy of any studies ( soils , geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site . <br /> C . PROJECT CHARACTERISTICS <br /> 1. Services : Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . Water Supply: ,�, 601 ,S <br /> b. Sewage Disposal : all „ !5 , <br /> C . Storm Drainage : <br /> If an extension of any of the above is necessary, indicate <br /> which service ( s ) , what agency will be providing the <br /> service ( s ) , and the distance of the extension ( s ) : <br /> d. Natural Gas : ,E <br /> e . Electricity: c's <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> `.6✓, ; — S 70 ' . <br /> g . Fire: se- Distance to nearest fire station: 2_ <br /> h . Schools : L. a. X. AD <br /> 2 . Describe any site altera.tions which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> n S /tG rtSlice7'�di1 _ /hin0�' l7, s�r.�q�-,-1 <br /> GrQ�/ir��t i drAi�A�c bws i r <br /> I <br /> 3. Air Quality Information: <br /> i <br /> Number and type of vehicles associated with completed prooject <br /> is Lo 70�5 - /✓D/rr,�e/ r cie%-,�j� ��c- GJW,7l'S <br /> Types of emissions and sources. associated with project <br /> 'es/Y,.w 7�,.t <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project' <br /> Will the project result in substantial airlemissions or deteriora- <br /> tign of . ambient air quality? i ✓NO YES <br /> i <br /> 4 . How much agricultural land will be removed from production? <br /> i <br /> Irrigated .$"./ t Not irrigated <br /> Major__Subdivision -� 9 - (6/86 ) <br /> i <br />