Laserfiche WebLink
L Page 12 li. TL 686-082-02 <br /> f If there is a substantial lapse of time between the <br /> L � � <br /> submission of our report and the start of additional work at the <br /> site, or if conditions have changed due to natural causes at or <br /> adjacent to the site, we urge that ur report be reviewed to <br /> determine the applicability oflJ the conclusions and <br /> recommendations considering the changed conditions and time <br /> lapse. Il N <br /> Our professional services were performed, our findings t <br /> obtained, and our recommendations prepared in accordance with <br /> generally-accepted engineering principles and practices . This <br /> i <br /> warranty is in lieu of all other warranties, either expressed or <br /> implied. j <br /> We appreciate the opportunity to be of service to Pacific <br /> Gas and Electric Company on this project. If you should have any <br /> i <br /> questions regarding the information contained herein, please do <br /> not hesitate to contact. } i <br /> rSincerely, I'I <br /> THE TWINING LABORATORIES, INC. <br /> q�0onodocea���q M <br /> Dale S. Stanton I���oppoFESb'0� to t <br /> Engineer .�REnect `� D. � ATE r <br /> Project s °•-..r ..EXPIRATION D <br /> ��.- `,- -� 49/30/91 <br /> Environmental Engineering Department <br /> s t7 ; <br /> � � C35I47 <br /> 9 <br /> $ '�1 e••o.ee.e"' alp <br /> Harry D. Moore, RCE 1 m��A ' i <br /> Vice-President/General Manager i} <br /> DSS:HDM:tc <br /> II Fresno Modesto Visalia Bakersfield <br /> .lmi <br />