My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007288
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2211
>
3500 - Local Oversight Program
>
PR0545106
>
ARCHIVED REPORTS_XR0007288
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 4:21:53 PM
Creation date
12/19/2019 4:04:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007288
RECORD_ID
PR0545106
PE
3529
FACILITY_ID
FA0003694
FACILITY_NAME
RIVER CITY PETROLEUM CARDLOCK
STREET_NUMBER
2211
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11707050
CURRENT_STATUS
02
SITE_LOCATION
2211 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y) ) <br /> EDB was detected in MW#I for this event <br /> CONCLUSIONS <br /> The water table elevations on this site continue to fluctuate Concentrations of TPHg have continued <br /> fluctuating in the shallow wells with the rise and fall of the groundwater elevation The groundwater <br /> gradient was to the northwest for thus event, a change from the previous event The last event had a <br /> hydraulic gradient to the west, which was a complete reversal of the historic trends If the present <br /> condition continues,this may explain the plume movement to the west under the building It also may <br /> be concluded that when the groundwater elevation drops,the gradient changes from the east to the west <br /> RECOMMENDATIONS <br /> The work plan under funding consideration by the UST Fund should address many concerns about the <br /> scope of the investigation of both 1,2-DCA and EDB Results from both the CPT work and the two new <br /> monitoring wells should give information for future recommendations It is recommended that the site <br /> continue to be monitored on a quarterly basis <br /> WORK IN PROGRESS <br /> The work in progress,is quarterly monitoring of the existing monitoring wells The soil stockpile on the <br /> westside of the site has been classified as non-detect for all analytes Preapproval for stockpile removal <br /> and the aforementioned work plan have been requested of the UST Fund <br /> Please contact Ervin Rifenburg of this office if you have any questions on these reports <br /> Respectfully submitted, <br /> Q��ssio�� <br /> Foothill Enginee �, yaflsFrk6_2 ��c�y� <br /> `"+" No 197 0 <br /> Ervin Rifenburg, E <br /> OFC <br /> Attachments Water Analysis Report, Del-Tech Report, Site Map, Water Sample Analysis Recap <br /> Concentration Contours, Soil Sample Analysis Recap, As-built of MW#9S & D <br /> cc Sheldon Heckman, Connell Motor Truck Co one copy <br /> Kama Harngfeld 2291 W March Lane Suite B100 Stockton CA 95207 one copy <br /> i <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.