Laserfiche WebLink
r ► I� <br /> E <br /> I, <br /> !I <br /> SPILL PREVENTION CONTROL AND COUNTERMEASURE i <br /> COMPLIANCE INSPECTION PLAN j <br /> RF.vmw PAGE s <br /> In accoxdance with 40 CFR 112 S(b), a review and evaluation of this SPCC; Plan Is conducted at least <br /> Once evc:,,, three years As a result of this review and evaluation, <br /> _ will amend the SPCC Plaa within six months of the reviews to include more l <br /> effective prevcntion and control technology iP: <br /> (1) Such technology will significantly reduce the hkeLhood of a spill event from the facility, and <br /> (2) If such technology has been Meld-proNan at the tune of review Any amendment to the ! <br /> SPCC Plan shall be certiEed by a ProfcSsienal Engineer within six months after a change In the facility I, <br /> Design,construction, opet-ation, or maintenance occurs which maten,ally affects the facillues I <br /> Potcntial for the dzschar$e of oil into or upon the navigable waters of the Un.ted States or adlouLn.� I! <br /> Shorelines <br /> ! <br /> Review Dates Signature <br /> i <br /> 1. <br /> w. <br /> 3. { <br /> ! <br /> . 4. <br /> 6. - <br /> * SPCC Plan amended and ce-ithed by a Registered Professional Engineer per 40 CFR 112 3(d; <br /> MANAGEMENT APPROVAL I <br /> is committed to the prevention of discharges I, <br /> of oil to navigable waters and the eavwnment, and ma.iatwzis the highest standards for spill I, <br /> prevention control and countermeasures through regular review, updatxna, and implementation of <br /> this Spill Prevention Control and Countermeasure Plan. <br /> i <br /> Authorized Facility <br /> Representative. .._-- Signature- ,- <br /> I <br /> �I <br /> i <br />