Laserfiche WebLink
• i <br /> section to the bottom of MW#9S screen section <br /> Funding <br /> This work plan is subject to both the PHS-EHD of San Joaquin County permit and funding from the UST <br /> Cleanup Fund The county must issue the required well drilling permits and the funding is subject to <br /> preapproval of the State of California UST Cleanup Fund before this work can be started <br /> Please consider this proposed work plan at the earliest opportunity If any questions arise,please contact <br /> Ervin Rifenburg at this office,Ph (209)36$-9381 <br /> • <br /> Respectfully submitted, <br /> a <br /> Foot ngine ng V%C)FEss kp <br /> Rtff <br /> rvin Rifen , <br /> orC <br /> . Attachments Proposed Location Map,Proposed Monitoring Well Design Drawing,Recap ofMonitonng <br /> Well Groundwater Analysis <br /> cc CONNELL MOTOR TRUCK CO 1 <br /> P O BOX 8467 <br /> STOCKTON, CA 95202 <br /> • <br /> 3 <br />