Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOG 2000 <br /> Al <br /> SAMPLE LOCATION / MW - 3 DATE: 12/21/00 <br /> PROJECT NAME CONNELL MOTORS ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS 2211 N WILSON WAY SAMPLE TIME 15 39 <br /> CITY,STATE STOCKTON, CA SAMPLE CONTAINERS 2 V O A'S <br /> SITE CONTACT NONE PRESERVATIVES HCL <br /> CONSULTANT FOOTHILL ENG LAB ANALYSIS BY SHERWOOD LABS <br /> PROJECT MANAGER IRV MONUMENT FLUSH <br /> SAMPLER DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDIA GROUNDWATER P I D READING/ODOR NIA GAS <br /> TOP OF CASING EL VA ION MSL COLOR GREY TO CLEAR <br /> DEPTH TO WATER feet 100th's 43 04 FEET CALC PURGE VOL 277 GAL <br /> DEPTH OF WELL feet 100th's 6002 FEET TOTAL VOLUME PURGED 9 GAL <br /> STANDING WATER COLUMN 1698 FEET DEPTH OF PUMP NIA FEET <br /> FIELD PARAMETERS <br /> • TIME CUMULATIVE DRAW PUMPING pH E C TEMP ORPDISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (D T W) (GPMILPM) (units) (UMIIOS) (Ceksius) (MVal(s) (PPM) (N T U) <br /> 0 NIA 5 GPM 673 1214 21 -73 NIA GREY <br /> 3 672 1204 21 -88 CLEAR <br /> 6 " 672 1198 214 -89 " <br /> 9 673 1 192 214 -85 " <br /> PURGE ME'T'HOD DEDICATED WATERRA PUMP <br /> SAMPLE METHOD DEDICATED WATERRA PUMP <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 44 86' <br /> WELL INTEGRITY CAP& SEAL ARE SECURE LOCK INSTALLED <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br /> WEATHER RAIN WIND NW5 <br /> QUALITY CONTROL ALL PURGING E UIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL STEEL DRUM OR 60 GAL POLYDRUM <br /> INSTRUMENTATION Y S 1 3560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE 580B P I D <br /> KECK INTERFACE METER TURBIDITY METER <br /> #OF DRUMS ON SIGHT WATER SOIL <br />