Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOG 2000 <br /> SAMPLE LOCATION /MW - 8S DATE: 12/21/00 <br /> PROJECT NAME CONNELL MOTORS ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS 2211 N WILSON WAY SAMPLE TIME 1127 <br /> CITY,STATE STOCKTON, CA SAMPLE CONTAINERS 4 V O A'S <br /> SITE CONTACT NONE PRESERVATIVES HCL <br /> CONSULTANT FOOTHILL ENG LAB ANALYSIS BY SHERWOOD LABS <br /> PROJECT MANAGER IRV MONUMENT• FLUSH <br /> SAMPLER DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA 1" / 0 1632 <br /> SAMPLE MEDIA GROUNDWATER P I D READING 1 ODOR NIA SOLVENT <br /> TOP OF CASING ELEVATtbN MSL COLOR BROWN TO LIGHT BROWN <br /> DEPTH TO WATER feet 100th's 4341 FEET CALC PURGE VOL 271 GAL <br /> DEPTH OF WELL, feet 100th's 6000 FEET TOTAL VOLUME PURGED 9 GAL <br /> STANDING WATER COLUMN 1659 FEET I DEPTH OF PUMP N/A FEET <br /> FIELD PARAMETERS <br /> TIME CUMULATIVE DRAW PUMPING pH E C TEMP O R P. DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (D T W) (GPM/LPM) (units) (UMHOS) (Celsius) (Mvolts) (PPM) (N T U) <br /> 0 N/A 5 GPM 661 1196 197 -132 N/A BROWN <br /> 3 656 1205 199 -I27 It <br /> LT BRN <br /> 6 657 1208 199 -85 " <br /> 9 " ti652 1232 196 -80 " " <br /> PURGE METHOD DEDICATED WATERRA PUMP <br /> SAMPLE METHOD DEDICATED WAT&RRA PUMP <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 52 06' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE LOCK INSTALLED <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br /> WEATHER RAIN WIND NW5 <br /> QUALITY CONTROL ALL PURGING E UIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL STEEL DRUM OR 60 GAL POLY DR UM <br /> INSTRUMENTATION Y S 13560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br /> . SOLINIST SLOPE METER THERMODINE 590B P I D <br /> KECK INTERFACE METER TURBIDITY METER <br /> #OF DRUMS ON SIGHT WATER SOIL <br />