Laserfiche WebLink
f <br /> Please consider this proposed work plan at the earliest opportunity If any questions arise please contact <br /> Ervin Rzfenburg at this office, Ph (209)368-9381 <br /> Respectfully submitted, <br /> Foothill Engineering <br /> Ervin Rifenburg, PE <br /> cc CONNELL MOTORTRUCK CO <br /> P O BOX 8467 <br /> STOCKTON, CA 95202 <br /> ADDENDUM 6/15/2000 <br /> Revised Scope of Work Addendum(Requested by San Joaquin County PHS-EFID) <br /> Add to this work plan three deep soil borings with monitoring wells installed and trio shallow Sc,11 <br /> borings with monitoring wells installed(see attached revised drawing) The deep soli bores will be di filled <br /> first at each bore location The deep soil bore will determine the vertical delineation of the plume The <br /> deep bores will extend to bottom of the plume The shallow soil borings will extend ten feet into the top <br /> of the plume as determined by the deep soil borings <br /> Proposed soil boring MW#8D is located inside the existing building and is subject to height restrictions <br /> This soil boring may be delayed due the lack of drilling equipment that will meet the height requirements <br /> of the building <br /> All soil sampling and analysis for these five monitoring wells are to meet the same r(--g11 enleJ:ts of tl1- <br /> ongindl work plan <br /> This addendum proposed by, <br /> Foothill EngineFs <br /> 6 <br /> Ervin Ri enb rg, PE \ H <br /> � ink <br /> CN, <br /> 3 <br />