My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007302
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2211
>
3500 - Local Oversight Program
>
PR0545106
>
ARCHIVED REPORTS_XR0007302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 4:18:23 PM
Creation date
12/19/2019 4:12:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007302
RECORD_ID
PR0545106
PE
3529
FACILITY_ID
FA0003694
FACILITY_NAME
RIVER CITY PETROLEUM CARDLOCK
STREET_NUMBER
2211
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11707050
CURRENT_STATUS
02
SITE_LOCATION
2211 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SAMPLING PROCEDURE <br /> All monitoring wells will be developed and purged After purging, each well will be sampled for <br /> analysis <br /> SAMPLE ANALYSIS <br /> Samples will be transported under ice to Sherwood Labs for analysis Soil samples will be analyzed <br /> by EPA methods 8020 (BETX), 5030/8015(M) (TPH Gasoline) Water samples will be analyzed by <br /> EPA methods 602 (BETX), 5030/8015(M) (TPH Gasoline) and EPA Method 3540/8015(M) (TPH <br /> Diesel) Results of the laboratory analysis will be presented in an engineering report It is recommended <br /> that samples not be analyzed for oxygenates, as none were found in the UST pull samples <br /> REPORTS <br /> All findings will be reported in a standard engineering report prepared by Foothill Engineering This <br /> report will contain all results of sample analysis and water gradient information Also,conclusions and <br /> recommendations for any future action will be included <br /> Please consider this proposed work plan at the earliest opportunity If any questions arise,please contact <br /> this office at Ph (209)368-9381 <br /> Respectfully submitted, <br /> Foothill Engineering <br /> Q�,pFE85/p� <br /> RI FENBG�F, <br /> z <br /> m <br /> M <br /> Ervi ife urg, Exp 1975 <br /> i <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.