Laserfiche WebLink
WATER SAMPLING PROCEDURE <br /> All monitoring wells will be developed and purged After purging, each well will be sampled for <br /> analysis <br /> SAMPLE ANALYSIS <br /> Samples will be transported under ice to Sherwood Labs for analysis Soil samples will be analyzed <br /> by EPA methods 8020 (BETX), 5030/8015(M) (TPH Gasoline) Water samples will be analyzed by <br /> EPA methods 602 (BETX), 5030/8015(M) (TPH Gasoline) and EPA Method 3540/8015(M) (TPH <br /> Diesel) Results of the laboratory analysis will be presented in an engineering report It is recommended <br /> that samples not be analyzed for oxygenates, as none were found in the UST pull samples <br /> REPORTS <br /> All findings will be reported in a standard engineering report prepared by Foothill Engineering This <br /> report will contain all results of sample analysis and water gradient information Also,conclusions and <br /> recommendations for any future action will be included <br /> Please consider this proposed work plan at the earliest opportunity If any questions arise,please contact <br /> this office at Ph (209)368-9381 <br /> Respectfully submitted, <br /> Foothill Engineering <br /> Q�,pFE85/p� <br /> RI FENBG�F, <br /> z <br /> m <br /> M <br /> Ervi ife urg, Exp 1975 <br /> i <br /> 3 <br />