My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROBINDALE
>
2214
>
2900 - Site Mitigation Program
>
PR0505640
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 4:54:07 PM
Creation date
12/19/2019 4:51:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505640
PE
2950
FACILITY_ID
FA0003511
FACILITY_NAME
CONSTRUCTION RENTAL SERVICES
STREET_NUMBER
2214
STREET_NAME
ROBINDALE
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
11906128
CURRENT_STATUS
02
SITE_LOCATION
2214 ROBINDALE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SMTH SITE SAFETY PLAN <br /> Job Name: Ascheman Property <br /> Job Location: 2214 Robindale Avenue <br /> Client Name: Bernhardt and Betty Ascheman <br /> Project Number: 95-112 <br /> General Work Description: Collect soil samples at 15 and' 20 feet below grade <br /> beneath each end of the former tank (4 samples total) <br /> using direct push technology. <br /> SSP Prepared by: John P. Lane <br /> On-site Safety Officer: Tom Lutterman j <br /> Project Safety Officer: John P. Lane <br /> i <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by <br /> all on-site employees, subcontractors, and visitors prior to entering the site. General safe <br /> work practices are identified in the Smith Environmental Technologies Corporation <br /> (SMTH) Injury and Illness Prevention Manual and apply to all SMTH work sites. <br /> i <br /> The provisions set-forth in this SSP shall apply to SMTH employees and any subcontractors <br /> working for SMTH at the job site. All personnel working for SMTH at the job site must <br /> read this SSP, and sign the attached Compliance Agreement before entering the work area. <br /> Feld personnel may deviate from the safety provisions set-forth in this SSP, but only to i <br /> upgrade or increase the safety requirements. SMTH personnel may suspend work if unsafe <br /> working conditions are identified or observed, or unauthorized modifications to the safety <br /> provisions set-forth in this SSP are made. If changes in site or working conditions require <br /> changes in safety procedures, appropriate amendments to this SSP wiil.be provided by the <br /> SMTH project manager or supervisor, with the written approval of a SMTH branch safety <br /> officer or the SMTH Health and Safety Director. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.