Laserfiche WebLink
SMT H SITE SAFETY PLAN <br /> On-site communications: ❑ Radio a Verbal ❑ Hand Signals <br /> ZI Other <br /> Designate hand signals here: <br /> Off-site communications: D Radio ® Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The speck signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site-prior to beainninct work activities. <br /> MARK EVACUATION ROUTEIS/ ON SITE MAP ❑ CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment (i.e., <br /> loves coveralls will be vlaced on and covered with-6- <br /> mil plastic sheeting along with the drill cuttings. <br /> Location of Wash Water: Site Office <br /> i <br /> Location of Toilet: Site Office <br /> Location of Drinking Water: SMTH truck/Site Office <br /> MARK LOC477ON OF EYEWASH AND SHOWER DRENCH ON SITE MAP ❑ CHECK WHENDOAE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- <br /> site until appropriate disposal methods are <br /> determined. <br /> PAGE a <br />