Laserfiche WebLink
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PLAN Page 2 of 3 <br /> LOCATION OF HMMP FOR EMPLOYEE USE <br /> (10) OFFICE <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br /> The following types of neighbors(e.g. residential, commercial, open space)are located within 1/8th mile of our facility. <br /> Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown. This information <br /> should be provided to the 9-1-1 operator at the time of the initial notification. <br /> NORTH OPEN SPACE EAST RICHARDSONS AUTO REPAIR <br /> SOUTH FAR EAST CAFE WEST OPEN SPACE <br /> SPILL CONTROL PROCEDURES SECTION <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> SPILL CONTROL LEADER (12) MIKE MURRAY/MANAGER <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> REFUGIO REYES/SERVICE MANAGER <br /> AUTHORIZED SPILL CONTROL STRATEGIES (14) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of <br /> hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br /> hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br /> needed equipment are shown on the facility map. At a minimum our business must isolate the area of the spill and <br /> make notifications. <br /> SPILLS OF LIQUID MATERIALS <br /> r7 Plug and Patch Container r Build Retention Dike <br /> Remove Sources of Ignition r Position Container so as to Stop Leak <br /> Reduce Pressure in Container/System r. Isolate Area and Make Notifications <br /> r Neutralize Spilled Material r Secure System Valves and Closures <br /> F-1 Shutdown System Involved r Apply Absorbent Material to Spill Area <br /> r N/A <br /> RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> F' Shut Off Valves/Systems r Cover Spill to Prevent Spread <br /> r Ventilate Area of Release r Neutralize Spilled Materials <br /> r Reduce Pressure in Container/System r Position Container so as to Stop Leak <br /> F_ Suppress Vapors with Water r Place Spilled Material into Drum or Bag <br /> F', Isolate Area and Make Notifications r Isolate Area and Make Notifications <br /> r Remove Sources of Ignition r N/A <br /> F_ N/A <br /> SPILLS OTHER <br /> AUTHORIZED CLEANUP COMPANIES SECTION (15) <br /> http://sjoesdata.org/oes_hmmp/section_tables/HMMP_ps_Review.lasso?-Database=transact... 3/2/2010 <br />