My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
REMOVAL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 12:14:14 PM
Creation date
12/26/2019 9:53:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1997
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SAFETY PLAN <br />for <br />Client: Public Health Services - SJ Countv Project No: 619-0796 <br />Site Location: Stockton Unified School District <br />Corporation Yard <br />1392 E1 Pinal Drive <br />Stockton. CA 95205 <br />Phone: 209-953-4069 <br />Fax: 209-953-4762 <br />1.0 INTRODUCTION <br />This site safety plan (SSP), designed to address safety provisions during tank removal <br />activities, provides procedures to protect onsite personnel from physical and chemical <br />hazards. The SSP establishes personnel responsibilities, general safe work practices, safe <br />field procedures, personal protective equipment (PPE) standards, decontamination <br />procedures, and emergency action plans. <br />This SSP conforms with health and safety requirements promulgated by the United States <br />Occupation Safety and Health Administration (OSHA) and California Occupational Safety <br />and Health Administration (Cal -OSHA). <br />2.0 RESPONSIBILITIES OF KEY PERSONNEL <br />Personnel will have assigned responsibilities. The Project Manager assigned to supervise <br />field work will serve as the site safety officer (SSO). The SSO or a designated alternate will <br />ensure that all onsite personnel have received a copy of the SSP. The SSO will be <br />responsible for ensuring that all personnel understand and comply with this SSP. The SSO <br />will be responsible for initiating emergency response procedures if necessary. Before work <br />begins, the SSO will conduct a site-specific training session to ensure all onsite personnel are <br />aware of potential chemical hazards, physical hazards, and safe work practices. <br />Onsite personnel must initially complete a 40 -hour hazardous materials training course as <br />required by Code of Federal Regulations (CFR) 1910.120. Thereafter, they are required to <br />complete an 8 -hour hazardous materials refresher course annually. Compliance with the SSP <br />will be monitored at all times by the SSO. Appropriate PPE, listed in Section 7.0, will be <br />made available and used by onsite personnel. Personnel will take reasonable precautions to <br />avoid unforeseen hazards. They will be held responsible to perform only those tasks for <br />which they are qualified. Each person will be responsible for strict adherence to all <br />procedures described in the SSP. Any deviation will be reported to the SSO and corrected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.