My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
REMOVAL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 12:14:14 PM
Creation date
12/26/2019 9:53:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1997
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Establish procedures for exciting the hot zone before commencing onsite <br />activities. <br />7.0 PPE <br />PPE may be required to safely perform onsite work. Onsite personnel will have access to <br />respirators with organic vapor cartridges. Replacement cartridges will be available onsite as <br />needed. When handling samples, the geologist will wear nitrile or neoprene gloves. <br />Personnel will wear hard hats and steel -toed boots when in the proximity of drilling <br />equipment. <br />PPE required for this project includes: <br />Hard hat. <br />?. Steel -toed boots or chemically -resistant booties. <br />3. Safety glasses with side -shields or safety goggles. <br />4. Ear plugs or muffs. <br />5. Coveralls or other suitable work clothing. <br />8.0 WORK ZONES AND SECURITY MEASURES <br />Access to the site will be restricted to authorized personnel. Barricades and/or traffic cones <br />will be placed to form a barricade at least 50 feet away from and surrounding the site tank <br />removal operations. The SSO will be responsible for site security. <br />9.0 DECONTAMINATION MEASURES <br />The best method for protection is to avoid contamination. To achieve this, comply with the <br />safety precautions discussed in Section 6.0. Drilling and sampling equipment will be <br />decontaminated by steam cleaning before being brought onsite. Sampling equipment will be <br />decontaminated before each sample is taken and drilling equipment will be decontaminated <br />before each boring is drilled. <br />
The URL can be used to link to this page
Your browser does not support the video tag.