Laserfiche WebLink
14.0 RESPONSIBLE PARTIES <br />Responsible parties involved with the Underground Storage Tank Removal Project: <br />• Client: Stockton Unified School District <br />Address: 1392 E1 Pinal Drive <br />Stockton, CA 95205 <br />• Contact: Charles Lubner <br />Title: Supervising Engineer <br />Phone: 209-395-4069 Fax: 209-953-4762 <br />• Contractor: Ramos Environmental Engineering, Inc. <br />1515 South River Road <br />West Sacramento, CA 95691 <br />Contact: Richard Nickerson <br />General Manager <br />Phone: (916) 371-5747 <br />15.0 SUMNIARY OF SITE ORGANIZATION AND COORDINATION <br />General: Richard Nickerson <br />Site Safety Officer (SSO): Don Updegraff <br />Subcontractor: n/a <br />Driller: n/a <br />Driller's Helper: n/a <br />• SITE ACCESS CONTROL <br />Is activity outside or indoors? outside <br />s <br />Is the working area barricaded? barricaded and fenced <br />Is the working area well ventilated? ves <br />Is the activity on OR offsite? onsite <br />Is the public right-of-way affected? no <br />If so, how? <br />(Example: Activity is onsite, outside and well ventilated. The working area will be <br />barricaded at least 10 feet in all directions. The public right-of-way will not be affected.) <br />