Laserfiche WebLink
f <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 one form per facility) <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rot. <br /> V. <br /> i� <br /> FACILr1T ID It(Agency Use Only) r t; <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> , t0Q11+'Do n 15 r- <br /> BUSINESS SITE ADDRESS lm. BUSLNESS SITE CITY 104. <br /> 19g�, ��- Pl aL S�oc�Cfo <br /> �..... _. <br /> SPILT:' SOL AND CLEANUP P„METHODS <br /> This plan addresses unauthorized releases from UST.systems and supplements the emergency response plans and procedures in the facility s Hazardous Materials <br /> Business Plan(HM13P). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless shill suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated,it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 1 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> 111".'SPILLO�iTRCYT.0-MCLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and afler each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERAIANENTLY ON-SITE BUI'AVAILABLE FOR USE IF NEEDED: (Complete nly#applicable) <br /> EQUIPMENT 1 LOCATION p AVAILABILITY <br /> U A IV u S RIO. a56�'4 <br /> a, (ICT to Ilv p C. R20. a l•-� _ R30- <br /> R11. �'1 �ose• Cq. R2 1. R31. <br /> R12. 1T ,( R22 R32. <br /> n <br /> 1 1 Q S 0 1 L R13. 1 (1 R23. R33. <br /> RI4. R24. R34. <br /> R15. R25. R35. <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME _ R40. TrrLE RSo. <br /> l L 771 lam'. L i r; :�. u N v!tj <br /> -LL R51. <br /> NAA7E R41.� C l a TITLE � Z.w 5 �QGn- <br /> NAME BQTR41 ITME Rs2. <br /> C31 u-, S oo K ! e S <br /> NAME R43. TITLE R53' <br /> t` <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> D 1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION D 2, INSPECTION BY QUALIFIED PERSON'S D 3. RECALIBRATION OF EQUIPhhtEhh I R60. <br /> 99. OTHER(Specify): W I Lt. C Q LLP StR61. <br /> eco X� T�5t <br /> UN-022B-113 www.unWos.org Rev.04/02/08 <br /> I <br /> £T0 0T0(2 XFId 80 ;TT I1HS 60OZ/60/90 <br />