My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1986 - 1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:34:30 PM
Creation date
12/26/2019 2:51:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1990
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/01 <br /> . .� VI <br /> �PUBLIC HEALTH SE� ES <br /> SAN JOAQUIN COUNTY '� c <br /> JOGI KHANNA M.D.,M.P.H. - <br /> Health Officer <br /> P.O. Box 2009 (1601 East Hazelton Avenue) • Stockton,California 05201 � 9� <br /> (209) 468-3400 <br /> TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br /> San Joaquin County Public Health Services Environmental Health Division has <br /> established the following guidelines to assist you in the completion of <br /> your construction project. The guidelines specify the construction and <br /> monitoring details needed to complete our review of your underground <br /> storage tank system. <br /> 1. SUBMITTAL OF PLANS <br /> a. Submit 4 complete sets of detailed drawings to the Environmental <br /> Health Division. One set will be retained by the department. <br /> b. Include equipment specification sheets and manufacturer' s <br /> brochures describing operating and monitoring systems. <br /> C. Include detailed monitoring and response plans. <br /> 2 . PLAN REVIEW AND OPERATING PERMIT FEES <br /> a. New facility plan review fee of $30.00 and operating permit <br /> application fee of $150. 00 plus $50. 00 per additional tank is due <br /> at time of plan submittal plus $56. 00 per tank State surcharge. <br /> b. New installation of additional tank at existing facility is <br /> $30. 00 plan review plus $50.00 per new tank permit fee plus State <br /> surcharge. <br /> 3 . PLAN REVIEW GUIDELINES <br /> a. The enclosed plan review sheet is provided for your information <br /> to assist you in interpreting our requirements for new tank <br /> systems. <br /> b. A letter will be sent to you in the event deficiencies are found <br /> in the tank plans. <br /> C. A copy of the California Underground Storage Tank Regulations can <br /> be obtained from the State Water Resources Control Board <br /> (916) 324-i'262 or from this office for a handling fee of $2 . 00. <br /> d. Please check with the San Joaquin County Air Pollution Control <br /> District, Building Department and Fire District for their <br /> requirements. <br /> e. Submittal of new tank plans to this agency satisfies tank <br /> registration requirements for the State of California. <br /> f. Please allow five (5) to fifteen (15) working days for plan <br /> review. <br /> g. Field inspections associated with the plan review process should <br /> be ,arranged twenty-four (24) hours in advance. <br /> h. A total of three (3) inspections will be made of the tank system <br /> being installed according to the enclosed inspection record. <br /> io complete and submit an application to operate underground storage <br /> tank(s). <br /> A Divkion of San Imniiin r twnry t4-1.1,r,,,. .� 0°41- <br />
The URL can be used to link to this page
Your browser does not support the video tag.