My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1986 - 1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:34:30 PM
Creation date
12/26/2019 2:51:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1990
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTroN'IA <br /> ARTICLE 3, SECTION 2631 <br /> MOTOR VEHICLE OR NONMOTOR VEHrCLE FUEL TANK <br /> CONSTRUCTION STANDARDS <br /> —I. Secondard containment provided. <br /> . Primary containers shall be product tight. <br /> 3. Secondary containers <br /> A. Thickness, density, composition, and product compatibility, <br /> B. Sized to contain unauthorized releases for sufficient time to allow <br /> detection and removal . <br /> 4. Secondary container volumetric requirements <br /> A, Single primary container - 100%. <br /> B. Multiple primary containers - 150% of largest primary container or <br /> 10% above aggregate. <br /> 1 . Document interproduct compatibility <br /> 5. Secondary containers open to rainfall . <br /> A. Volumetric requirement - 24 hours of 25 year storm in addition to <br /> primary container volumes. <br /> 6. Pore space of granular material used as backfill for the primary containers. <br /> A. Refer to Section 2631 (g). <br /> 1. Secondard container equipped with a collection system. <br /> A. Designed to: <br /> 1 . Accumulate <br /> 2. Temporarily store <br /> 3. Permit removal of: <br /> a. Precipitation <br /> b. Subsurface infiltration <br /> c. Released hazardous substances from primary container(s) . <br /> A. Floor of Secondary container <br /> A. Constructed on firm base <br /> Q. Sloped to collection sump (1/8" per foot) . <br /> 1 . One or more access casings installed in sump <br /> a. Sized to allow removal of collected liquid <br /> b. Extend to ground surface <br /> c. Perforated in sump region. <br /> d. Covered with a locked waterproof cap or within a secured facility <br /> e. Thick enough to withstand anticipated stresses <br /> f.- Construction materials : <br /> 1 ) Are not weakened- by stored product <br /> 2) Will not donate, capture, or mask constituents to be analyzed. <br /> 9. Membrane liner specifications : <br /> A. Refer and comply with Article 3, Section 2631 j , k, 1 , and m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.