Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: STOCKTON UNIFIED SCHOOL DIST, 1932 EL PINAL DRIVE STOCKTON CA 95205 <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> OFFICE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . <br /> . . . . . . . . . . TSI 1000 EFI <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> n O srP RUL. . . <br /> . . . <br /> . . . . . . . . . . . <br /> � . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 3 4. . . . . ..5-6. f -.RUL. . . . . . . . . . . . . . . <br /> A=ANNULAR . . . <br /> .... <br /> . <br /> . . F=FILL <br /> DIESEL. . . . . . . . . . . . . . . <br /> 1.2. <br /> DSL. OA O STP J <br /> . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> BUS WASH . . . . . . . . . . . <br /> Date map was drawn <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels,sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />