Laserfiche WebLink
SWRCB, January 2002 Page of <br /> 5. PIPNG SUMP TESTING <br /> Test Method Developed By: ;❑Sump Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used ^TEquipment Resolution <br /> _._�. �� !. ✓�Nj!� R"S7. -- _...:. ,.. � ... .. ',Fl.'<.v:�.y ,... .. s.V�.;i... -.t.a.:''.'duRa.....-. .. <br /> Agx Sump # Sump # Sump# Sump# <br /> Sump Diameter: Z` f Z` <br /> Sump Depth: ` <br /> Sump Material: <br /> Height from Tank Top to Top of ti , <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: ( / <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' 21FLQo✓� ( T 2"mue— 06T <br /> Does turbine shut down when <br /> sump sensor detects liquid(both a Yes ❑No ❑NA ❑Yes ❑No El NA ❑Yes ❑No E,NA ❑Yes [I No ❑NA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown? L Yes ❑No C1NA ❑Yes ❑No ❑NA ❑Yes ❑No C:NA Yes ❑No ❑NA <br /> Was fail-safe verified to be L Yes ❑No ❑NA ❑Yes ❑No ❑NA 0 Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: b /"1 It.) /v M. r� _ <br /> Test Start Time: T30 <br /> Initial Reading(RI): <br /> Test End Time: c1; S 0z) <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: . KPass ❑Fail 'pass ❑Fail !] Pass ❑.Fail ❑ Pass ❑Fail. <br /> Was sensor removed for testing? ey, <br /> es ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and fes ❑No ❑NA 17'�Yes ❑No 0 NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />