Laserfiche WebLink
01/2B/2002 10: 06 2094683433 FIFTH FLOOR PAGE 03 <br /> WRITTEN MONITORING AND RESPONSE PIAN <br /> UNDERGROUND STORAGE TANK MONITOMIG PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> coaditiorzs of the operating pemut.The permit hold er must notify Environmental 11calth Department,(209)468-3420 <br /> uithin 30 days of any changes to the monitoring procedures,unless required to obtain approval or a pe='t before makwg <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FACILITYNAME Stockton Unified School District DATE 1/29/2002 <br /> FACIL=ADDRESS 1932 N El Pinal <br /> I.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> Keith Nelson/Vehicle Maintenance Supervisor <br /> Shields, Harper & Co./Stockton Service Station Equipment Co. <br /> 2.Describe the frequency ofperformiag the monitoring for: Tank Sentinel TS-1000 <br /> TANKS . automated system PIPING automated system <br /> 3.Describe the location(s)of where the monitoring will be performed, ie:location ofsensors <br /> 29.63 Sanguinetti Lane/Stockton/Transportation Office <br /> 4.Describe the following equipment for each underground storage tank <br /> Name and Model of Monitoring Panel _ TS-1000/2-P <br /> Nance and Model of nine Teak Detectors FX1V <br /> Name and Model of Annular Sensors OPT <br /> Name and Model of Piping Sensors TSP-ULS <br /> Name and Model of Dispenser Sensors TSP-ULS <br /> Type of overfill prevention Drop tube with overflow preventor valve <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shutdown the turbine? Yesl) No❑ <br /> Does the turbine shut down if a sensor is disconnected? 'Yesn No 0 <br /> Does the turbine shut down is the monitoring panel loses power? 'YesKI No 0 <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> All activity is recorded in the underground storage tank monitoring log <br /> maintained in the Transportation Office. (2963 Sanguinetti Lane) <br /> 7.Maintenance of the monitoring equipment must be performed at least once overy 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.'What month will <br /> annual monitoring certification be performed in? Each January monitoring system certification <br /> is performed by an outside vendor. <br /> Note:1-or new installations the secondary contdinntent must be tested 6 months after installation.All secondary containment systems <br /> rnnst be tested once every 36 months with initial testing,performed before.Decernber3l,2003. <br /> 8. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br /> equipment. Training for the operation of UST_ system occured upon installation of <br /> the TS-1000 (Tank Sentinel) <br /> I.-r=emi-It\US'Mtonitoringpl2n.doc <br /> 1/24/2002 <br />