Laserfiche WebLink
Chandler Martin -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-05-247 (MS) <br /> 3. Drainage from each parcel shall be retained on-site by a retention basin (18-inch maximum depth). Drainage <br /> for each parcel shall be calculated by a registered civil engineer or an architect prior to recording of the <br /> Parcel Map. The required volume shall be noticed by a statement on the Certificate of Compliance. The <br /> statement shall read"Drainage from each parcel shall be retained on-site by a retention basin and the <br /> required volume shall be..." (Development Title Section 9-1135.9) <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> NPDES construction permit. <br /> DG:SH:ar <br /> PACOMAIENTSWSWR 2005\PA-0500247.wpd <br />