My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005344 ENG DES PLN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
4620
>
2600 - Land Use Program
>
PA-0500531
>
SU0005344 ENG DES PLN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 5:18:25 PM
Creation date
12/27/2019 8:23:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
ENG DES PLN
RECORD_ID
SU0005344
PE
2627
FACILITY_NAME
PA-0500531
STREET_NUMBER
4620
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
APN
01709002
ENTERED_DATE
8/26/2005 12:00:00 AM
SITE_LOCATION
4620 E WOODBRIDGE RD
RECEIVED_DATE
8/26/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\4620\PA-0500531_PA-0300206\SU0005344\ENG DES PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 INTRODUCTION <br /> 1.1 PURPOSE <br /> The purpose of this preliminary design report is to provide the process design for The Wine Cup <br /> Motor Coach Resort Wastewater Treatment Plant (WCMCRWWTP). This proposal consists of <br /> three sections, including introduction, packaged WCMCRWWTP design, and unit process design. <br /> The appendices include process design calculations, design drawings, and mechanical <br /> equipment specifications. Gl <br /> 1.2 DESIGN BASIS <br /> The WCMCRWWTP is designed and will be built to receive and dispose of the domestic sewage <br /> from Wine Cup Motor Coach Resort, Acampo, California. Wine Cup Motor Coach Resort consists <br /> of 52 standard space and 95 pull through spaces. The gated park will have 147 RV spots - <br /> many of them designed to be large enough to accommodate exMnsive motor coaches - as well <br /> as a swimming pool with waterfall, spa, sauna, clubhouse, exercise room, game room, small <br /> grocery mini-mart, four shower/restroom buildings, laundry facilities and hook ups for water, <br /> sewer, electricity, telephone, satellite TV and wireless Internet. <br /> The average dry weather design flow for the WCMCRWWTP will be 25,000 gallons per day <br /> (gpd). The design criteria is summarized in Table 1, based upon the information gathered from <br /> the Client. <br /> Table 1 Design Flow Conditions and Effluent Quality <br /> ITEMS INFLUENT EFFLUENT <br /> Average dry weather flow d 25 000 <br /> BODS (mg/L 350 10 <br /> TSS (mg/L 250 10 <br /> Turbidity NTU :52 <br /> TN (mg/L 10 <br /> TKN (mg/L 40 <br /> NH3-N (mg/L 25 2.0 <br /> Total Coliform (MPN) :52.2 colonies/100 mL in 7 days <br /> :523 colonies/100 mL in any 30 days <br /> :5100 colonies/100 mL in any sample <br /> The WCMCRWWTP shall function to remove both organic matter (BODS) and the total nitrogen <br /> (TN). Generally, the organic loading of the packaged wastewater treatment plant is based upon <br /> a design average flow and is used for sizing the biological system. The hydraulic loading of the <br /> Wine Cup Motor Coach Resort WWTP Page 2 of 10 8/22/2007 <br /> Preliminary Design Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.