Laserfiche WebLink
Rick Griffin <br /> COMMUNITY DEVELOPMENT <br /> PA-0800183 (SA) <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$213.22 per additional daily trip-end generated in <br /> the Lodi area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record.) (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee is based on the current schedule. (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> BD: <br /> \\sjpwgov.org�6hares\DevServices\DPubServ\COMMENTS\SA\Yr 2008\PA-0800183 rev.doc <br />