Laserfiche WebLink
REVISED MONITORING AND REPORTING PROGRAM NO. 93-112 -2- <br /> LODI VINTNERS,INC. <br /> SAN JOAQUIN COUNTY <br /> Constituent Units Type of Sampling Reporting <br /> Sample Frequency Frequency <br /> Freeboard feet (±0.1) Measurement Weekly Monthly <br /> pH1,2 pH Units Grab Weekly Monthly <br /> Odors -- Observation Weekly Monthly <br /> Electrical Conductivity 1,2 µmhos/cm Grab Weekly Monthly <br /> ' Samples shall be collected at a depth of one foot from each pond in use, opposite the inlet. Samples shall be collected <br /> between 0700 and 0900 hours. <br /> 2 If ponds do not contain wastewater,that shall be reported. <br /> EFFLUENT MONITORING <br /> Samples shall be collected from an established sampling station located in an area that will provide <br /> representative samples of the water in Pond No. I (the pond into which wastewater is first discharged). <br /> Samples shall be collected for each of the parameters listed below. Effluent monitoring of the pond shall <br /> include, at a minimum, the following: <br /> Constituent Units Type of Sampling Reporting <br /> Sample Frequency Frequency <br /> Biochemical Oxygen Demand' mg/L Grab Monthly Monthly <br /> Nitrate as Nitrogen' mg/L Grab Monthly Monthly <br /> Total Kjeldahl Nitrogen' mg/L Grab Monthly Monthly <br /> Total Dissolved Solids' mg/L Grab Monthly Monthly <br /> Fixed Dissolved Solids mg/L Grab Monthly Monthly <br /> Standard Minerals 1,2,3 mg/L Grab Quarterly Quarterly <br /> ' If the pond does not contain wastewater,that shall be reported. <br /> 2 Standard Minerals shall be sampled quarterly for eight consecutive quarters and then shall be sampled annually(during the <br /> fourth quarter of the year). <br /> 3 Standard Minerals shall include at least the following compounds: boron,calcium, iron,magnesium,manganese, <br /> potassium, sodium,chloride,sulfate,total alkalinity(including alkalinity series),and hardness. <br /> SOLIDS MONITORING <br /> The Discharger shall record and report monthly the quantity, disposal location, and method of disposal of <br /> solids disposed of during the processing season, as well as during the off-season, if applicable. If solid <br /> waste is shipped offsite, then an estimated amount of the material, the disposal location, and the waste <br /> hauler shall be reported in the monthly report. <br /> GROUNDWATER MONITORING <br /> Groundwater monitoring shall commence with the third quarter 2006. Prior to construction and/or <br /> sampling of any groundwater monitoring wells, the Discharger shall submit plans and specifications to the <br /> Regional Board for approval. Once installed, all new wells shall be added to the monitoring network and <br />