Laserfiche WebLink
1-4, Single Phase Development <br /> Start of Construction(Month;Year): Gross Acres: <br /> End of Construction(Month/Year): Net Acres(area devoted to buildings/structures.); <br /> First Date of Occupation(Month/Year): Paved Parking Area(;#of iptcvs); <br /> Building Square Footage: Number of Dwelling Units; <br /> J. On-Site Air Pollution Reductions (Mitigation Measures) <br /> Listed below are categories of possible nlitigmion measures that will reduce a project's impact on air quality, If'a category is <br /> applicable to the project,check"Yes",and please complete the corresponding page to identity specific titigation measures%ithin <br /> that cweiory. If a category is notapplicible to the pr�icct,check"No'. <br /> 1. Construction Clean Fleet(making a commitment to using a construction fleet that will achieve the emission reductions required by <br /> District Rule 9510) <br /> ❑ Yes,please complete mitigation measure 1 <br /> to No <br /> 2. Land Use/Location (e.g.increased density,improve walkability design.increase transit,etc,) <br /> ❑ Yes,please cwnplele applicahie ndtigation measures 2a through 2f <br /> �( <br /> No <br /> 3. Neighborhood/Site Enhancements(e.g.improve pedestrial network,traffic calming measures,NEV network,etc.) <br /> ❑ Yes,please cvmpleie applicable mitigation measures 3a 1hrturgh Jc <br /> CK No <br /> 4. Parking Policy/Pricing(e.g.parking cost,on-street market pricing, limit parking supply,etc.) <br /> ❑ Yes, please complete applicable mitigation measure 4a through 4e <br /> No <br /> 5. Comnttite.Trip Reduction Programs(e.g.workplace parking charge,employee vanpool/shuttle)ride sharing program,etc,) <br /> ❑ Yes,please complete applicable mitigation measures Sa through 5f <br /> No <br /> 6. Building Design(e.g.woodstoves or fireplaces) <br /> ❑ Yes,please evmpleie mitigotion meusure 6 <br /> (� No <br /> 7. Building Energy(e.g.exceed title 24,electrical maintenance equipment) <br /> ❑ Yes,please complete applicable mitigation meast:res 7a Mrough 76 <br /> (� <br /> No <br /> E.Solar Panels(e.g,incorporate solar panels in the project) T <br /> ❑ Yes,please coutplele applicable mitigation measure 8 <br /> [5 Nb <br /> 9.Electric Vehicle(EV)Charger(e.g. incorporate EV charger(s)in tete project) <br /> ❑ Yes,please complete applicable mitigation measure 9 <br /> No <br /> ..... <br /> K. Review Period <br /> You may request a five(5)day period to review a draft of the District's analysis of your project before it is finalized. However,if you <br /> choose this option,it will delay the project's finalization by five(5)business days. <br /> ❑ I request to review a draft of the District's analysis, <br /> Central Region Office: 1990 E,Gettysburg Ave,Fresno,CA 93726-0244 TEL(559)230.6000 FAX(559)230.6061 WE3,aN;,valkypirbr(t <br /> Page 3 of 12 Residential/Non-Residential/Mixed-Use Application Form Revised June 28,2019 <br />