Laserfiche WebLink
Mitigation Measure 3b: Provide Traffic Ca.imfng Measures <br /> Will this project provide traffic claming measures which encourage people to walk or bike instead of using a vehicle (e,g., marked <br /> crosswalks,count-dawn signal timers,curb extensions,speed tables,raised crosswalks,raised intersections,median islinds,tight corner <br /> radii,roundabouts or mini-circles,on-street parking,planter strips with street trees,chicanesichokers,and others)? <br /> ❑ No <br /> ❑ Yes,please complete seclions below: <br /> %Streets with Itnprovernent within V2 mile of projcut site: ❑25% ❑50% ❑75%. ❑ 100°'0 <br /> r %Intersections with Improvement within V.,inile of prt)ject site: ❑25% ❑ 50% [175% ❑ 100% <br /> y NVili this mitigation measure be required as a condition of Approval by the land use agency,by other county or municipal <br /> codes,or other? <br /> ❑ No(n<rle: if checked "no")his mif%gctflon nreusure will require District enforcement) <br /> ❑ Yes.Name of enforcing agency: <br /> Source of Requirement: <br /> Mitigation Measure 3c: implement Neighborhood Electric Vehicle (NEV) Network <br /> Will the project provide a NEV network including the necessary infrastructure such as parking, charging facilities, striping,signage, <br /> and educational tools'? <br /> *Note: \rEVs are classified in the California Vehicle Code as a"low speed vehicle". <br /> ❑ No <br /> ❑ Yes,please comlilele sections below: <br /> Will this rnitigation measure be required as a condition of approval by the land use agency,by other county or municipal <br /> codes,or other? <br /> ❑ No(prole: if checked"no"this nriligation measure will require District enforcement) <br /> ❑ Yes,Name of enforcing agency: <br /> Source of Requirement:__,_, <br /> Mitigation Measure 4a: Limit Parking Supply <br /> Will the project provide fewer parking spaces than the rate provided by the Institute of Transportation and Engineering(ITE)Parking <br /> Generation Handbook? <br /> p No <br /> ❑ Yes,please complete sections below: <br /> y %Reduction in Spaces: <br /> r Will this mitigation measure be required as a condition of approval by the land use agency,by other county or municipal <br /> codes,or other? <br /> ❑ No(note:if checked"no"this ndligasion meusnre ivill require District enjbrcenrew) <br /> ❑ Yes,N;unc of enforcing agency: <br /> Source of Require men t; <br /> Mitigation Measure 4b: Unbundle Parking Cast <br /> Will the project impletnent a monthlytannual parking charge? <br /> ❑ <br /> No <br /> © Yes,please coniplele Sections below; <br /> k Monthly Parking Cost for Project Site(S): <br /> r Will this mitigation measure be required as a condition of approval by the land use agency,by other county or municipal <br /> codes,or other? <br /> ❑ No(note: iij'chechd"no"this mifir,ation measure will require Dislric(enforcement) <br /> ❑ Yes,Name of enforcing agency: <br /> Source of Requirement: <br /> Central Region Office: 1990 E.Gettysburg Ave,Fresno,CA 93728-0244 TEL(559)230-6000 FAX(559)230.6061 WEB tip„ra.vaite ai f:r�tn <br /> Page 8o(12 Residential/Non-Residential/Mixed-Use Application Form Revised June 28,2019 <br />