Laserfiche WebLink
Mitigation Measure 8: Solar Panels <br /> Will the project include the installation of solar parcels? <br /> ❑ No <br /> ❑ Yes,please corrrplele sections below: <br /> `r Total power output of solar panels to be installed: M(e.g.:200 hamesx 300-600W.) <br /> Will this mitigation measure be required as a condition of approval by the land use agency,by other county or municipal <br /> codes,or other? <br /> ❑ No(note;if checked"no"this miligailon measure will r•egtrire,District errJnrcemenl) <br /> ❑ Yes,:~;time of enforcing agency: <br /> Source of Requirement: <br /> Mitigation Measure 9: Electric Vehicle (EV)Charger <br /> Will the project include the installation of electric vehicle(EV)charger(s)? <br /> ❑ No <br /> ❑ Yes,please complete sections below: <br /> r Number of charging outlet(s)to be installed (Nare:a clanger rrralf have one or more charging outlets): <br /> y Charging level(e.g.:Level 1,Level 2,or DC last Charge)-, <br /> e- Will this mitigation measure be required as a condition ofapproval by the land use agency,by other county or municipal <br /> codes..or other? <br /> ❑ No(note: if checked"no"this mitigation measure will require District enforcement) <br /> ❑ Yes,Name of enforcing agency: <br /> Source of Requirement: <br /> Central Region Office: 1990 E.Gettysburg Ave,Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230.6061 WEB ym mwilleytik.ja <br /> Page 12 of 12 Reside'nraVNan-Residential/Mixed-Use Application Form Revised June 28,2019 <br />