Laserfiche WebLink
Stantec <br /> First Quarter 2011 Status Summary Report <br /> Former Tosco Bulk Terminal No. 10013 <br /> April 29,2011 <br /> Six piezometers (P-1 through P-6)were installed in 2003 in the southwest portion of the site and <br /> offsite to monitor the effectiveness of the GWETS. Piezometers P-1 through P-3 were installed <br /> to monitor MW-8, and piezometers P-4 through P-6 were installed to monitor MW-14. <br /> Twelve oxygen injection points (IP-1 through IP-12) were installed in June 2007 under the <br /> oversight of EarthTech at locations nearby and surrounding monitoring wells MW-8 and MW-14. <br /> Nine of the injection points (I13-1 through IP-9) were installed at approximately 25 feet below <br /> ground surface (bgs) with 15 feet of 0.020-inch slotted casing from approximately 10 to 25 feet <br /> bgs (A-zone), and three injection points (IP-10 through IP-12)were installed at approximately 50 <br /> feet bgs with 15 feet of 0.020-inch slotted casing from 35 to 50 feet bgs (B-zone). <br /> Between December 17 and 21, 2007, mobile oxygen injection activities were initiated at the site. <br /> Between December 21, 2007 and June 20, 2008, there have been a total of twelve oxygen <br /> injection events completed on a bi-weekly basis. During each two-day event, oxygen injection <br /> into IP-1 through IP-12 was completed using bottled oxygen transported to the site by Stantec. <br /> The amount of oxygen injected into each well was 150 ft3 (13.4 pounds) per injection event <br /> conducted through April 24, 2008. During the oxygen injection events conducted in May and <br /> June 2008, 300 ft3 (26.7 pounds) of oxygen was injected into each well. Approximately 2,964 <br /> pounds of oxygen has been injected at the site during the pilot study activities between <br /> December 17, 2007 and June 20, 2008. <br /> On July 9 through 13, 2009, Stantec oversaw Cascade Drilling Inc. install four off-site oxygen <br /> injection wells (IP-14 through IP-17) and oversaw the destruction of seven off-site injection wells <br /> (IP-01, IP-04 through IP-09). Wells IP-14 through IP-17 was installed to enhance the potential <br /> effectiveness of the oxygen injection activities. <br /> On July 27 and 28, 2009, Stantec initiated the continuation of the oxygen injection pilot study to <br /> assess the continued effects of introducing oxygen into the targeted saturated zones beneath <br /> the sites. Utilizing wells IP-10, IP-11, IP-14 through IP-17, and MW-22 as remedial injection <br /> wells, 300 cubic feet(26.7 pounds) of oxygen were injected into each well on a bi-weekly basis. <br /> Oxygen injection activities were halted in December 2010. <br /> QUARTERLY MONITORING ACTIVITIES AND RESULTS <br /> Groundwater monitoring during the first quarter 2011 was performed in accordance with revised <br /> MRP No. R5-2004-0824, which is included as Appendix A. <br /> During the fourth quarter 2008, Stantec added to the frequency of selected monitoring points to <br /> better understand data trends and site characteristics. Monitoring wells MW-2, MW-3, MW-16, <br /> MW-17B, MW-18C, MW-20, MW-21B, and MW-22C are now monitored and sampled quarterly. <br /> In addition, monitoring wells MW-8 and MWA4 are now purged prior to sampling. <br /> 2 <br />