Laserfiche WebLink
1m First Quarter 2012 Status Summary Report <br /> Former Tosco Bulk Terminal No.10013 <br /> April 30,2012 <br /> ' Six piezometers (P-1 through P-6) were installed in 2003 in the southwest portion of the site and <br /> offsite to monitor the effectiveness of the GWETS. Piezometers P-1 through P-3 were installed <br /> to monitor MW-8, and piezometers P-4 through P-6 were installed to monitor MW-14. <br /> ' Twelve oxygen injection points (IP-1 through IP-12) were installed in June 2007 under the <br /> oversight of EarthTech at locations nearby and surrounding monitoring wells MW-8 and MW-14. <br /> Nine of the injection points (IP-1 through IP-9) were installed at approximately 25 feet below <br /> ' ground surface (bgs) with 15 feet of 0.020-inch slotted casing from approximately 10 to 25 feet <br /> bgs (A-zone), and three injection points (IP-10 through IP-12) were installed at approximately 50 <br /> feet bgs with 15 feet of 0.020-inch slotted casing from 35 to 50 feet bgs (B-zone). <br /> ' Between December 17 and 21, 2007, SECOR initiated mobile oxygen injection activities were <br /> initiated at the site. Between December 21, 2007 and June 20, 2008, there was a total of twelve <br /> oxygen injection events completed on a bi-weekly basis. During each two-day event, oxygen <br /> injection into IP-1 through IP-12 was completed using bottled oxygen transported to the site by <br /> SECOR. The amount of oxygen injected into each well was 150 ft3 (13.4 pounds) per injection <br /> event conducted through April 24, 2008. During the oxygen injection events conducted in May <br /> and June 2008, 300 ft3 (26.7 pounds) of oxygen was injected into each well. Approximately <br /> 2,964 pounds of oxygen has been injected at the site during the pilot study activities between <br /> December 17, 2007 and June 20, 2008. <br /> ' On July 9 through 13, 2009, Stantec oversaw Cascade Drilling Inc. install four off-site oxygen <br /> injection wells (IP-14 through IP-17) and oversaw the destruction of seven off-site injection wells <br /> ' (IP-01, IP-04 through IP-09). On July 27 and 28, 2009, Stantec injected 150 cubic feet (13.4 <br /> pounds) of oxygen per well into wells IP-11, IP-14, IP-15, IP-16, IP-17 and MW-22 for a <br /> combined total of about 80 pounds. <br /> 1 Between December 17, 2007 and December 28, 2010, Stantec performed bi-weekly oxygen <br /> injections. During oxygen injection events Stantec injected 300 cubic feet (26.8 pounds) of <br /> ' oxygen into wells IP-10, IP-11, IP-14, IP-15, IP-16, IP-17 and MW-22 for a combined historic <br /> total of about 9,105 pounds. <br /> Oxygen injection activities were discontinued in December 2010. <br /> QUARTERLY MONITORING ACTIVITIES AND RESULTS <br /> ' Groundwater monitoring during the First Quarter 2012 was performed in accordance with <br /> revised California Regional Water Quality Control Board - Central Valley Region Monitoring and <br /> Reporting Program (MRP) No. R5-2004-0824, included as Attachment A. Groundwater <br /> monitoring activities were performed on March 5 and 6, 2012, by ATC Associates Inc (ATC). <br /> 2 <br />