My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_THIRD QUARTER 2010 STATUS SUMMARY REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2900 - Site Mitigation Program
>
PR0009275
>
ARCHIVED REPORTS_THIRD QUARTER 2010 STATUS SUMMARY REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:33:49 PM
Creation date
1/6/2020 1:40:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
THIRD QUARTER 2010 STATUS SUMMARY REPORT
RECORD_ID
PR0009275
PE
2960
FACILITY_ID
FA0004014
FACILITY_NAME
VALERO ENEREGY CORP/NUSTAR ENERGY
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203003
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Third Quarter 2010 Status Summary Report <br /> Former Tosco Bulk Terminal No. 10013 <br /> October 26,2010 <br /> LIMITATIONS <br /> This report has been prepared for the exclusive use of ConocoPhillips and its representatives as <br /> it pertains to the property located at 3505 Navy Drive, Stockton, California. The evaluation of <br /> subsurface conditions at the site for the purpose of this investigation is inherently limited due to <br /> the number of points of investigation. There are no representations, warranties, or guarantees <br /> that the results are representative of the entire site. Data from this report reflects the conditions <br /> at locations at a specified time. No other interpretation, representations, warranties, <br /> guarantees, express or implied, are included or intended in the report findings. <br /> If you have questions or comments regarding this quarterly summary report, please do not <br /> hesitate to contact Sean Coyle (Stantec Project Manager) at (916) 861-0400 ext. 222. <br /> Sincerely, <br /> Stantec Consulting Corporation <br /> \ONAL G ". <br /> • y5 Fps ., <br /> kED)j, <br /> L 22 <br /> G-1, <br /> Ed Simonis, P. * �P•c's9"'� ' ' <br /> Wesley Sn der ' <br /> Project Scientist Senior Geologist '.;rqT..,• <br /> F Fo , <br /> C,p4nVP`�, <br /> Enclosures: <br /> Table 1 Groundwater Monitoring Program <br /> Table 2 Well Construction Details <br /> Table 3 Third Quarter 2010 Groundwater Elevations <br /> Table 4 Third Quarter 2010 Groundwater Analytical Results <br /> Table 5 Oxygen Injection Summary <br /> Table 6 Dissolved Oxygen Summary <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Groundwater Contours A-Zone Third Quarter 2010 <br /> Figure 4 Groundwater Contours B-Zone Third Quarter 2010 <br /> Figure 5 Groundwater Contours C-Zone Third Quarter 2010 <br /> Figure 6 MTBE Concentrations A-Zone Third Quarter 2010 <br /> Figure 7 TBA Concentrations A-Zone Third Quarter 2010 <br /> Figure 8 MW-1 Concentrations and Groundwater Elevations <br /> Figure 9 MW-2 Concentrations and Groundwater Elevations <br /> Figure 10 MW-8 Concentrations and Groundwater Elevations <br /> Figure 11 MW-14 Concentrations and Groundwater Elevations <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.