Laserfiche WebLink
' A N A 1, Y T I (; A 1, <br /> L A 13 0 11 AT 0 111 E S <br />' Analysts BTEX TPN(D) <br /> Data of Receipt 01/18/95 <br /> Project Name Van Den Bergh <br /> Project Number P92219 3 <br />' Case Number Ch950129 <br /> Page 2 of 3 <br />' Sample Cross Reference <br />' BSK Sample Number Client Description Matrix Date Collected <br /> 0129-1 MW-4 Liquid 01/17/95 <br />' 0129-2 MW-5 Liquid 01/17/95 <br /> 0129-3 MW-6 Liquid 01/17/95 <br />' Calibration <br /> Calibration was performed as per standard operating procedures and/or instrument specifications <br /> prior to sample analyses <br /> I <br /> Analytical Schedule <br /> IAnalysis Technique/Description <br /> BTEX Purge & Trap, GC with PID, FID <br /> ITPN(D) Liquid/Liquid Extraction, GC with FID <br /> I <br /> I <br /> 1414 5tanis[dus 4tit ct ° ! ri Sn [ ,1 9 t;[]h • ('bruit -009 197 2i11i8 1n ( A 900 1177 8110 0 1 arc 209 485 6935 <br />