My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008921
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
1400
>
3500 - Local Oversight Program
>
PR0545129
>
ARCHIVED REPORTS_XR0008921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:26:14 PM
Creation date
1/7/2020 8:58:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008921
RECORD_ID
PR0545129
PE
3528
FACILITY_ID
FA0006171
FACILITY_NAME
Mizkan America, Inc.
STREET_NUMBER
1400
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205-3743
APN
14115002
CURRENT_STATUS
02
SITE_LOCATION
1400 E WATERLOO RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
review of the project at least once, should the duration of thero ect exceed six s da The <br /> P J Y <br /> FC or project manager will conduct site safety inspections at least weekly, and take effective <br /> corrective action These weekly imspectnons will be documented on FADL forms <br /> Management safety reviews will be recorded on Safety Inspection Report Forms and will be <br /> { forwarded to the HS Depa went for review <br /> 8.5 Monitoring Records <br /> The Project Manager shall ensure that site monitoring records are complete and incorporated <br /> i into the project file Any personnel or area air monitoring results will be incorporated into <br /> the host office health and safety files The host office HS Coordinator will be responsible for <br /> estabhshung, maintaining, and forwarding to other IT offices (as necessary) all required <br /> monitoring information as described below for placement in individual employee files <br /> • Employee name, social security number, payroll number <br /> i <br /> • The date, tune, pertinent task information, exposure information <br /> • Description of the analytical methods, equipment used and calibration d <br /> data <br /> • Type of PPE worn <br /> t <br /> Engineering controls used to reduce exposure <br /> 8.6 Notification <br /> The project HS staff will ensure that each employee is informed in writing of the results <br /> which represent that employee's exposure Monitoring results representative of an <br /> { employee's exposure shall be reported in writing to the affected employee <br /> Whenever the results indicate that the representative employee exposure exceeds the <br /> Permissible Exposure Limit (PEL), the notification shall state that the PEL was exceeded and <br /> shall provide a description of the corrective action taken to reduce exposure to a level below <br /> the PEL <br /> IT may conduct IH monitoring on subcontractor employees Notification of subcontractor <br /> personnel of IH monitoring results is the responsibility of the subcontractor. <br /> M7J11-29-94/RHS/HASP/94-OD37.JAF= 8-3 <br />� I <br />
The URL can be used to link to this page
Your browser does not support the video tag.