Laserfiche WebLink
review of the project at least once, should the duration of thero ect exceed six s da The <br /> P J Y <br /> FC or project manager will conduct site safety inspections at least weekly, and take effective <br /> corrective action These weekly imspectnons will be documented on FADL forms <br /> Management safety reviews will be recorded on Safety Inspection Report Forms and will be <br /> { forwarded to the HS Depa went for review <br /> 8.5 Monitoring Records <br /> The Project Manager shall ensure that site monitoring records are complete and incorporated <br /> i into the project file Any personnel or area air monitoring results will be incorporated into <br /> the host office health and safety files The host office HS Coordinator will be responsible for <br /> estabhshung, maintaining, and forwarding to other IT offices (as necessary) all required <br /> monitoring information as described below for placement in individual employee files <br /> • Employee name, social security number, payroll number <br /> i <br /> • The date, tune, pertinent task information, exposure information <br /> • Description of the analytical methods, equipment used and calibration d <br /> data <br /> • Type of PPE worn <br /> t <br /> Engineering controls used to reduce exposure <br /> 8.6 Notification <br /> The project HS staff will ensure that each employee is informed in writing of the results <br /> which represent that employee's exposure Monitoring results representative of an <br /> { employee's exposure shall be reported in writing to the affected employee <br /> Whenever the results indicate that the representative employee exposure exceeds the <br /> Permissible Exposure Limit (PEL), the notification shall state that the PEL was exceeded and <br /> shall provide a description of the corrective action taken to reduce exposure to a level below <br /> the PEL <br /> IT may conduct IH monitoring on subcontractor employees Notification of subcontractor <br /> personnel of IH monitoring results is the responsibility of the subcontractor. <br /> M7J11-29-94/RHS/HASP/94-OD37.JAF= 8-3 <br />� I <br />