My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2941
>
2200 - Hazardous Waste Program
>
PR0513950
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 10:49:01 AM
Creation date
1/7/2020 9:49:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513950
PE
2247
FACILITY_ID
FA0009657
FACILITY_NAME
NUSTAR TERMINALS OPERATIONS PARTNERSHIP LP
STREET_NUMBER
2941
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206-1149
APN
48906-1
CURRENT_STATUS
01
SITE_LOCATION
2941 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX C - SPCC PLAT. Page 9 of 44 <br /> Stockton Terminal Page C-7 <br /> FIGURE C-4-SITE SPECIFIC SPCC PLAN, CONTINUED <br /> 40 CFR, 112.7 <br /> e INSPECTIONS TESTS AND RECORDS <br /> • The Company has developed a tank inspection program for all storage tanks in accordance with the API 653 <br /> Standard.As tanks become available,clean and gas free,the Company will contract with a certified API 653 <br /> inspector to perform a complete thorough inspection of the tank. <br /> • An API 653 inspection includes performing non-destructive testing of the tank steel to verify corrosion <br /> conditions.The API 653 inspection reports are maintained at the office of the terminal manager. <br /> • When measurements or tank conditions are found to be out of API 653 specifications,the necessary repair <br /> work will be completed prior to returning the tank tooperational service. <br /> • Terminal personnel perform regular inspections of facility equipment,operations,and spill containment <br /> areas.Inspections are performed in accordance with written procedures detailed on each inspection sheet. <br /> • Inspection and testing records are made part of this plan, but kept at hte office of the terminal manager.All <br /> inspection records associated with this SPCC plan will be maintained fora period of three years. <br /> • Integrity testing will follow the guidelines listed above and examples of these records documenting the testing <br /> can be found in the appendices to this plan. <br /> • Liquid level gauging devices are tested monthly to ensure proper operation. Maintenance records are kept at <br /> he facility. <br /> PERSONNEL TRAINING AND DISCHARGE PREVENTION PROCEDURES <br /> 1 PERSONNEL TRAINING <br /> • The Company has developed an employee-training program that addresses proper operation and <br /> maintenance of equipment to prevent the release of oil into navigable waters. <br /> • Review of the terminal's SPCC Plan, new revised regulations/laws/instructions,safe handling of <br /> hazardous materials, review of product storage and transfer operations,and recognize and identify pollution <br /> prevention opportunities. <br /> • Annually the Company will provide update training in the form of on-site meetings with all employees. <br /> Employee trainin will include review and instruction in each of the following categories: <br /> • The Company provides initial awareness training to all employees prior to the employee commencing <br /> operational duties.The employees are informed of the SPCC Plan,the purpose of the plan,and proper pollution <br /> prevention practices. <br /> • The overall purpose of this training program is ensuring that employees are kept informed of current <br /> operational procedures,and applicable spill prevention methods. <br /> • Terminal Operator 1 (6-12 Months)A)Meet all requirements above—Must meet all requirements of an <br /> Operator Trainee and be signed off by the terminal manager upon completion of all the above and a <br /> performance review.B)CBT's—Keep current on CBT's C)24-Hour Hazwoper Training-Must receive the 24- <br /> hour hazardous waste operations and emergency response training.D)Hand lining,sampling,and tank <br /> temperature checks—Operator should know how to properly hand line,sample and use the PET correctly on <br /> he tanks.E)Railcar Training and Test—Operator should pass the railcar written exam for our facility and have <br /> a minimum of 60 hours on the rail spur.Operator should be able to handle railcar paperwork and checklist and <br /> unloading procedures. F)Understanding of truck rack operations—Operator should know our truck loading J <br /> procedures and how to use the meters at the loading rack.G)VCU—Operator should have basic training on the s �; <br /> vapor control unit. Operator should know how to change out the temperature chart,reset the bum unit when <br /> faults occur,and drain the condensate tank.H)Annual Fire foam system training and operations—Operator <br /> should complete the fire foam system training and know how to verify the pressure gauges and conduct pump g <br /> est of the system.l)Air Permit 101 written test J)SWPP training and test—Operator should have knowledge of <br /> all storm water sumps and pumps,and completed the training from WGR.K)Knowledge of security plan L) <br /> Minor truck rack maintenance a. Scully replacement b.Dry break/loading couplers replacement c.Vapor hose <br /> and coupler replacement d.Swivel replacement e.Grease joints and preventative maintenance f. Draining of <br /> vapor condensate lines M)Know how to inspect for vapor leaks—Operator should be able the use LEL to <br /> detect any excessive limits in the atmosphere. N)AVGAS quality control—Operator should be able to test <br /> product on a daily basis and understand the importance of maintaining the quality of AVGAS.0)Gravity/Flash <br /> point/RVP/Sulfur Analyzer Training—Operator should be able to operate the Sulfur analyzer, RVP tester, Flash <br /> tester,and check product gravity using a hydrometer to determine the corrective API. P)Top Tech—Operator <br /> should be able to add drivers,add trucksttrailers,and update vapor certificates, check allocations and product <br /> blends. <br /> • Terminal Operator Trainee(Hire Date-6 Months,6-12 Months)A)NuStar policy-drug/alcohol,culture— <br /> Operator should have completed the policy upon hire. B)Loss control manual(Read and Signoff)—Operator <br /> must read and sign off the NuStar loss control manual,and become familiarized with the terminology. C)Safety <br /> http://www.trpcorp.com/valero/electronic_plan/1_tenninal epa_template/app_c.asp?MAI... 7/14/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.