My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2900 - Site Mitigation Program
>
PR0009275
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:46:13 PM
Creation date
1/7/2020 1:25:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0009275
PE
2960
FACILITY_ID
FA0004014
FACILITY_NAME
VALERO ENEREGY CORP/NUSTAR ENERGY
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203003
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEI-P87-049A <br /> May 18, 1987 <br /> Page 2 <br /> 1. 0 INTRODUCTION <br /> Kaprealian Engineering, Inc. (KEI) is pleased to submit this <br /> proposal for a preliminary subsurface investigation for the Mobil <br /> Terminal located on Navy Drive in Stockton, California. The <br /> proposed investigation will be conducted in accordance with the <br /> California Regional Water Quality Control Board (CRWQCB) Fuel <br /> Leak Guidelines. <br /> 2 . 0 SCOPE OF WORK <br /> Per our recommendations described in our report dated May 1, <br /> 1987, additional investigation is necessary to comply with the <br /> State and Local Regulatory Agencies regulation. Therefore, per <br /> the CRWQCB guidelines, KEI proposes to perform the work as <br /> outlined below: <br /> 2 . 1 Coordination with the Local Agencies <br /> 2 . 2 Installation and construction of three (3) monitoring wells <br /> as shown on attached sketch. <br /> 2. 3 During the well construction, soil samples will be collected <br /> at five foot intervals starting at a depth of ten (10) <br /> feet. Soil sampling will continue until the first water <br /> table is encountered. <br /> 2 . 4 Three monitoring wells (two inch diameter) will be <br /> installed. The monitoring wells will be observed for free <br /> product, sheen and odor. Water samples will be taken and <br /> analyzed for total hydrocarbons, Benzene, Toluene and Xylene <br /> per the CRWQCB guidelines. <br /> 2 . 5 Results of the samples will be evaluated as to the current <br /> and potential impact on the ground water. <br /> 2 . 6 A technical report will be submitted within thirty (30) days <br /> of completion of the soil and water sampling. The report <br /> will document the field work performed, chemical analyses of <br /> soil/groundwater, conclusions and recommendations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.