Laserfiche WebLink
PI <br /> PI <br /> PI ELECTRICAL <br /> CONTROL PANEL �— FROM POWER SOURCE <br /> (230V/30) — " — � � 1230V/30 POWER) <br /> 77 <br /> NEMA 3R SAFETY SWITCH <br /> -25' ( 100A) <br /> 6 0Ep <br /> 11301 IP02 IP03 o O SENSAPHONE NEMA1 <br /> ® BB O 2000 ELECTRICAL PANEL <br /> PI AirSep AS-A (30 SCFH) POWEREX <br /> OXYGEN GENERATOR ROTARY SCROLL <br /> pI COMPRESSOR <br /> AC/FAN 8 .8 SCFM@100 PSI _ DOUBLE <br /> DOORS <br /> i\\i\\ \\\i\\\i\\�\� — — — — — — — - - — — - - — OXYGEN — — — — — - - — — — �� LLjI JUNCTION BOX <br /> ° RECEIVERTF 1Trrht <br /> (60 GAL) <br /> 25AAA <br /> 12 Point <br /> FLOW METER <br /> MANIFOLD <br /> IP04 IP05 IP06 <br /> PI <br /> PI <br /> PI <br /> /i 7/777 <br /> \ \i\\\i\\\i\� <br /> -25' <br /> LEGEND <br /> IP INJECTION POINT <br /> IP07 IP08 IP09 PI PRESSURE INDICATOR <br /> 0 <br /> N PI <br /> L DI CHECK VALVE <br /> PI <br /> D� BALL VALVE <br /> N <br /> PI �— OXYGEN <br /> m <br /> — — — — — — OXYGEN (INSIDE FENCE) <br /> a — — ELECTRICAL <br /> o — — — — PHONE LINE <br /> N <br /> NOTES: <br /> L X X- FENCE <br /> cl <br /> -50' 1 . THE OXYGEN INJECTION TRAILER WILL BE PROVIDED BY MATRIX ENVIRONMENTAL TECHNOLOGIES INC. <br /> E KILOWATT HOUR METER <br /> Q0 2 . THE INJECTION POINTS WILL BE INSTALLED BY THE ENGINEER AND OTHERS. KM (POWER METER) <br /> N <br /> '1 3 . THE CONTRACTOR SHALL PROVIDE ALL MATERIAL, EQUIPMENT, AND LABOR TO INSTALL THE OXYGEN <br /> N <br /> INJECTION SYSTEM , <br /> c <br /> m IP10 I11311 IP12 <br /> x <br /> x <br /> 0 <br /> ° DESIGNED REVISION <br /> �U QreSSn„ YRN OXYGEN INJECTION SYSTEM <br /> FORMER TOSCOraavy� DRAWN 0 <br /> BULK TERMINAL NO , 10013 Earth Tech �, � ,�, MTT PROJECT <br /> CHECKED <br /> s 3505 NAVY DRIVE 4 "�° r REVIEWED Y" OXYGEN INJECTION SYSTEM PROCESS DRAWING 97841 <br /> 3 o ISSUED FOR CONSTRUCTION YH 0a10� STOCKTON , CALIFORNIA A tgCO Intemational Ltd. Company oFstt> DATE WS AND INSTRUMENTATION DIAGRAM P _� <br /> REV, DESCRIPTION OF REVISION BY DATE L <br />