My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2900 - Site Mitigation Program
>
PR0009275
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:58:37 PM
Creation date
1/7/2020 2:10:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009275
PE
2960
FACILITY_ID
FA0004014
FACILITY_NAME
VALERO ENEREGY CORP/NUSTAR ENERGY
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203003
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Assessment Report Outline - 2 - <br /> Depth <br /> 2 -Depth of bottom of casing <br /> Depth to top of sand pack <br /> Thickness of sand pack <br /> Depth to top of bentonite seal <br /> Thickness of bentonite seal <br /> Thickness of concrete grout <br /> Boring diameter <br /> Casing diameter <br /> Casing material <br /> Size of perforations <br /> Number of bags of sand <br /> Well elevation at top of casing <br /> Depth to groundwater <br /> Date of water level measurement <br /> Monitoring well number <br /> Date drilled <br /> Location <br /> Well Development <br /> Date(s) of development of each well <br /> Method of development <br /> Volume of water purged from well <br /> How well development completion was determined <br /> Method of effluent disposal <br /> Supporting Data: <br /> Field notes from well development should be included in report. <br /> Water Sampling <br /> Date(s) of sampling <br /> How boring/well was purged <br /> How many boring/well volumes purged <br /> Levels of temperature, EC, and pH at stabilization <br /> Sample collection, handling, and preservation methods <br /> Sample identification <br /> Analytical methods used <br /> Soil Sampling <br /> Date(s) of sampling <br /> Sample collection, handling, and preservation method <br /> Sample identification <br /> Analytical methods used <br />
The URL can be used to link to this page
Your browser does not support the video tag.