My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2900 - Site Mitigation Program
>
PR0009275
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:58:37 PM
Creation date
1/7/2020 2:10:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009275
PE
2960
FACILITY_ID
FA0004014
FACILITY_NAME
VALERO ENEREGY CORP/NUSTAR ENERGY
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203003
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> REVISED <br /> MONITORING AND REPORTING PROGRAM NO. 92-803 <br /> FOR <br /> BP OIL COMPANY <br /> STOCKTON FACILITY <br /> SAN JOAQUIN COUNTY <br /> Specific sample station locations are established under direction of the Board's staff. <br /> Prior to construction, plans and specifications for ground water monitoring and/or extraction <br /> wells shall be submitted to Board staff for review and approval. After construction. new <br /> wells are to be sampled and analyzed for the constituents below and added to the monitoring <br /> program. <br /> GROUND WATER MONITORD G <br /> There are nine monitoring wells (MWs) on-site as shown in Figure 1. The ground water <br /> monitoring program for the nine monitoring wells and any additional wells installed <br /> subsequently, shall include the following: <br /> Sampling <br /> Constituents Units Type of Sample Frequencyl <br /> Depth to ground Feet ---- Quarterly <br /> water <br /> Benzene it g/1 Grab Quarterly <br /> Toluene µg/1 Grab Quarterly <br /> Ethylbenze ne 1,4 g/1 Grab Quarterly <br /> Xylene it g/1 Grab Quarterly <br /> TPH as diesel µg/1 Grab Quarterly <br /> TPH as gasoline u g/1 Grab Quarterly <br /> Total Lead' µg/1 Grab <br /> ' MWs 5 and 6 shall be sampled during the first and third quarters only. <br /> From wells which have not been monitored for total lead. If total lead is <br /> detected, the Discharger shall perform verification sampling within 30 days of <br /> submittal of the monitoring report. If the presence of total lead is not <br /> confirmed, no further test is required. If pollution is verified, the Discharger <br /> shall continue quarterly monitoring for total lead. <br />
The URL can be used to link to this page
Your browser does not support the video tag.