Laserfiche WebLink
^ <br /> . .^ <br /> � rop�^.;9onw/^ pErswuoow. Governor <br /> ~~ <br /> '[�AL|FC>RN|A REGIONAL WATER QUALITY CONTROL BOARD— <br /> CENTRAL VALLEY REGION ^ <br /> f ^ <br /> 3+43 Rounsn ROAD. au/Ts A <br /> SAonAmsmro. oA esuur'aoya <br /> pHoms. (9161 361'5600 <br /> � <br /> `AX (916) 361-5686 1\�Q O q 1��� <br /> _ �� _ _ ,~°= <br /> ENVIRONMENTAL <br /> _ H— ' <br /> LTH <br /> pERM|9/SERV_E° <br /> 5 April 1992 <br /> Mr. Jeff Withrow <br /> BP Oil Company <br /> ` 3505 Navy Drive <br /> Stockton, CA 95206 <br /> \ <br /> TRANSMITTAL OF INSPECTION REPO0T, BP OIL COMPANY, STOCKTQN FACILITY, SAN <br /> JOAQUIN COUNTY <br /> Thank you for your assistance during my inspection of your facility on 10 <br /> March 1992, An inspection report, Spill Prevention Control and Countermeasure <br /> (SPCC) Plan checklist, tank inspection summary, and a site plan are enclosed. <br /> Overall , my inspection found the facility clean and well-maintained. However, <br /> the following items need to be addressed: <br /> l. The SPCC plan needs to be organized. It needs a table Of contents, <br /> pagination, appendices, attachments, current maps, etc. <br /> 2. The d00uOt Of wastewater generated, capacity for wastewater storage, and <br /> wastewater disposal method must be Clarified. <br /> 3. Design specifications used in constructing drainage and wastewater <br /> facilities must be delineated to demonstrate the adequacy of these <br /> facilities. <br /> 4' Visual inspection of storm water in the tank farm prior to discharge to <br /> land is inadequate to protect ground water or surface water quality, At <br /> (a minimum, the �1orm water must ba t�sted using U. 5. L. Method 6O2 <br /> prior to discharge. If constituents are present then the storm water <br /> will need be treated to 08St water quality objectives and you will need <br /> to obtain an NPDES Storm Water permit prior to discharge. Other <br /> alternatives for handling contaminated storm water include hauling it <br /> offsite for treatment and disposal Or discharge to the sewer. <br /> 5. Due to the types Of products /16 degrees API or lighter) Stored at the <br /> facility, a ground water monitoring program is required in accordance <br /> with Section 25270,7/c\ of the APSA. <br /> b, Items 13. 15, 26, 29, 32, 33, 34, 37. 50, and 52 Of the SPCC checklist. <br /> We request that you submit d report which addresses the above items by <br /> 24 April 1992. The report shall include d DldO and time schedule for <br /> implementation of the monitoring program. <br />