Laserfiche WebLink
4 SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC) PLAN CHECKLIST <br /> BP OIL COMPANY STOCKTON FACILITY <br /> YES NO N/A COMMENTS <br /> 33 Is there a discussion of containment X See Comment 15. In addition, the diked <br /> capacity sufficient to protect waters area may not provide ground water quality <br /> of the State [H&S 25270. 5(d) (3) ]? protection. The plan must specify if the <br /> containment area provides adequate <br /> capacity and protection of ground water <br /> quality. <br /> 34 Is there a discussion of an appropriate X The facility does not have a ground water <br /> ground water monitoring system [H&S monitoring program. <br /> 25270.7] ? <br /> 35 Is there a strong contingency plan X <br /> [112. 7(d) ] ? <br /> 36 Is there a written commitment to control X <br /> spills [112 . 7(d) ]? <br /> 37 Is there a discussion of facility X <br /> drainage from diked areas [112.7(e) (1) ]? <br /> 38 Is there a discussion of secondary X <br /> containment [112.7(e) (2) ]? <br /> 39 Are records kept of drainage from diked X <br /> areas [112 .7(e) (2) (iii) (D) ]? <br /> 40 Are records kept of steam return or X <br /> exhaust lines that discharge to surface <br /> waters [112 .7(e) (2) (vii) (A) ]? <br /> 41 Are the following devices used X <br /> [112.7(e) (2) (viii) ] ? <br /> 42 High level alarms with audible or X <br /> visual signs? <br /> 43 High level pump cutoff devices? X <br />