Laserfiche WebLink
MONITORING AND REPORTINL _RDER NO. R5-2013-XXXX - 5 - <br /> ST <br /> 5 - <br /> ST SERVICES, L.L.0 AND NUSTAR ENERGY L.P. <br /> BULK FUEL TERMINAL#29 <br /> 2941 NAVY DRIVE, STOCKTON, SAN JOAQUIN COUNTY <br /> Q) If applicable, the reasons for and duration of all interruptions in the operation <br /> of any remediation system, and actions planned or taken to correct and <br /> prevent interruptions. <br /> 8. An Annual Report shall be submitted to the Central Valley Water Board by <br /> 1 February of each year. This report shall contain an evaluation of the effectiveness <br /> and progress of the investigation and remediation, and may be substituted for the <br /> fourth quarter monitoring report, provided that all information that must be submitted <br /> in the fourth quarter report is included, along with the following minimum information: <br /> (a) Both tabular and graphical summaries of all data obtained during the year. <br /> (b) Groundwater contour maps and pollutant concentration maps containing all <br /> data obtained during the previous year. <br /> (c) A discussion of the long-term trends in the concentrations of the pollutants in <br /> the groundwater monitoring wells. <br /> (d) An analysis of whether the pollutant plume is being captured by an extraction <br /> system or is continuing to spread. <br /> (e) A description of all remedial activities conducted during the year, an analysis <br /> of their effectiveness in removing the pollutants, and plans to improve <br /> remediation system effectiveness. <br /> (f) An identification of any data gaps and potential deficiencies/redundancies in <br /> the monitoring system or reporting program. <br /> (g) If applicable, a proposal and rationale for any revisions to the groundwater <br /> sampling plan frequency and/or list of analytes. <br /> 9. The results of any monitoring done more frequently than required at the locations <br /> specified in the MRP also shall be reported to the Central Valley Water Board. <br /> 10.The Discharger shall implement the above monitoring program as of the effective <br /> date of the Order. <br />