My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011040
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
969
>
3500 - Local Oversight Program
>
PR0545144
>
ARCHIVED REPORTS_XR0011040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 9:21:34 AM
Creation date
1/9/2020 8:50:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011040
RECORD_ID
PR0545144
PE
3528
FACILITY_ID
FA0025676
FACILITY_NAME
CARNATION USA/CARNATION PLANT
STREET_NUMBER
969
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
969 E FREMONT ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WELL CONSTRUCTION SUMMARY <br /> 0 Project Chevron Real Estate Management Company Well: MW-4 <br /> Location: 540 North Aurora/969 East Fremont Streets Elevate nOatum:Ground:FMSL <br /> Personnel Jeffrey S. Pyle Top of Casing:FMSL <br /> DRILLING SUMMARY <br /> 10 Total Depth of Boring Below Ground Surface: 76 feet <br /> Boring Diameter. 10 inches <br /> ' Drilling Agency: Spectrum Exploration, Inc. <br /> Drilling Method: CME 85 <br /> Drilling Equipment: 14-inch hollow stem auger <br /> 20 Drilling Fluid: NA <br /> ' <br /> C1 Drilling Bits: NA <br /> G <br /> WELL DESIGN Construction Time Log <br /> ' 30 Basis: Geologic Log Task Start Finish <br /> C =Casing S= Screen F =Filter Date Time Date Time <br /> B =Bentonite Plug G= Grout M = Fill Drilling 11113/95 8:45 AM 11113MS 11:40 AM <br /> Feet BGS Code Feet BGS Code <br /> 0-50 C1 0 -46 G Casing: 11113145 1:00 PM 11113!95 120 PM <br /> 40 50-75 S 46 -48 B <br /> 75-75.5 C2 48 -76 F Filter 11/13/95 1:30 PM 11/13/95 2:17 PM <br /> ' Bentonite 11113W 2:18 PM 11113!95 2:24 PM <br /> B <br /> 50 _ :+�': "� ' Total Depth of Well BGS: 75 feet Grouting: 11/13145 3:05 PM 11/13195 4:35 PM <br /> = :. Total Depth of Weil Below TOC: 74.63 feet <br /> Casing: <br /> C1 4-inch Schedule 40 PVC <br /> C2 4-inch Schedule PVC endcap <br /> -; Screen: <br /> ' - S1 4-inch Schedule 40 PVC 0.010-inch slot <br /> 70 S2 <br /> ' C2 Filter Material: #2116 Lonestar sand <br /> BOHCLD 76 feet Bentonite Plug: Pellets <br /> Grout: Calaveras cement-Type I - II <br /> ' Fill Material: NA <br /> Surface Finish: Locking cover with water-tight, traffic-rated vault <br /> Centralizers: <br /> Other. <br /> Well Development: <br />-1- Comments: <br /> Project No. C3077 GEOMATRIX CONSULTANTS <br /> i" <br />
The URL can be used to link to this page
Your browser does not support the video tag.